11–13 May 2005
CERN, Prévessin
Europe/Zurich timezone

Session

Beam systems

not assigned
13 May 2005, 08:30
864-1-C02 (CERN, Prévessin)

864-1-C02

CERN, Prévessin

Conveners

Beam systems

  • Hermann Schmickler (AB-BDI)

Presentation materials

There are no materials yet.

  1. Benjamin Todd (AB-CO)
    13/05/2005, 08:30
    slides
    The Beam Interlock System (BIS) forms the backbone of the LHC Machine Protection System, allowing 100’s of distributed User Systems to inhibit beam operation and request Beam Dump from all around the LHC. he requirement for rapid response time of the BIS is coupled with very high safety constraints, as whilst providing a secure and robust protection. The system should not be a source...
    Go to contribution page
  2. Roland Jung (AB-BDI)
    13/05/2005, 08:40
    slides
    Installation of the various accelerator equipment will begin shortly. It is based on a very tight schedule. In order to be ready for hardware commissioning many basic equipment tests will have to be done during this installation period, such as cabling, basic hardware operation and some of the power tests. Those will all be done under the responsibility of the corresponding...
    Go to contribution page
  3. Olivier Brunner (AB-RF)
    13/05/2005, 08:45
    slides
    Installation of the various accelerator equipment will begin shortly. It is based on a very tight schedule. In order to be ready for hardware commissioning many basic equipment tests will have to be done during this installation period, such as cabling, basic hardware operation and some of the power tests. Those will all be done under the responsibility of the corresponding...
    Go to contribution page
  4. Oliver Aberle (AB-ATB)
    13/05/2005, 08:50
    slides
    Installation of the various accelerator equipment will begin shortly. It is based on a very tight schedule. In order to be ready for hardware commissioning many basic equipment tests will have to be done during this installation period, such as cabling, basic hardware operation and some of the power tests. Those will all be done under the responsibility of the corresponding...
    Go to contribution page
  5. Brennan Goddard (AB-BT)
    13/05/2005, 08:55
    slides
    Installation of the various accelerator equipment will begin shortly. It is based on a very tight schedule. In order to be ready for hardware commissioning many basic equipment tests will have to be done during this installation period, such as cabling, basic hardware operation and some of the power tests. Those will all be done under the responsibility of the corresponding...
    Go to contribution page
Building timetable...