Conveners
Beam systems
- Hermann Schmickler (AB-BDI)
-
Benjamin Todd (AB-CO)13/05/2005, 08:30slidesThe Beam Interlock System (BIS) forms the backbone of the LHC Machine Protection System, allowing 100’s of distributed User Systems to inhibit beam operation and request Beam Dump from all around the LHC. he requirement for rapid response time of the BIS is coupled with very high safety constraints, as whilst providing a secure and robust protection. The system should not be a source...Go to contribution page
-
Roland Jung (AB-BDI)13/05/2005, 08:40slidesInstallation of the various accelerator equipment will begin shortly. It is based on a very tight schedule. In order to be ready for hardware commissioning many basic equipment tests will have to be done during this installation period, such as cabling, basic hardware operation and some of the power tests. Those will all be done under the responsibility of the corresponding...Go to contribution page
-
Olivier Brunner (AB-RF)13/05/2005, 08:45slidesInstallation of the various accelerator equipment will begin shortly. It is based on a very tight schedule. In order to be ready for hardware commissioning many basic equipment tests will have to be done during this installation period, such as cabling, basic hardware operation and some of the power tests. Those will all be done under the responsibility of the corresponding...Go to contribution page
-
Oliver Aberle (AB-ATB)13/05/2005, 08:50slidesInstallation of the various accelerator equipment will begin shortly. It is based on a very tight schedule. In order to be ready for hardware commissioning many basic equipment tests will have to be done during this installation period, such as cabling, basic hardware operation and some of the power tests. Those will all be done under the responsibility of the corresponding...Go to contribution page
-
Brennan Goddard (AB-BT)13/05/2005, 08:55slidesInstallation of the various accelerator equipment will begin shortly. It is based on a very tight schedule. In order to be ready for hardware commissioning many basic equipment tests will have to be done during this installation period, such as cabling, basic hardware operation and some of the power tests. Those will all be done under the responsibility of the corresponding...Go to contribution page