11–13 May 2005
CERN, Prévessin
Europe/Zurich timezone

Session

From Hardware Commissioning to Cold Checkout

not assigned
13 May 2005, 10:20
864-1-C02 (CERN, Prévessin)

864-1-C02

CERN, Prévessin

Conveners

From Hardware Commissioning to Cold Checkout

  • Simon Baird (AB-CO)

Presentation materials

There are no materials yet.

  1. Simon Baird (AB-OP)
    13/05/2005, 10:20
    slides
    Three phases of getting the complete LHC from the Hardware commissioning into a full Machine Checkout have been outlined in the last LHC Chamonix Workshop. These are: 1. Cooldown and Closure of the complete machine 2. System and Equipment tests per sector 3. Complete Machine cycles The Hardware Commissioning team is responsible for the Hardware Commissioning itself and AB/OP...
    Go to contribution page
Building timetable...