  1. Marc Vanden Eynden (AB-CO)
    11/05/2005, 16:00
    slides
    The installation of the LHC control system hardware is a major step to be completed before the start of the LHC hardware commissioning phase. The control of the core LHC systems involved during hardware commissioning (power converters, power interlock system, quench protection system) requires in practice the full installation of most of the LHC control system hardware and associated...
    Go to contribution page
  2. Eugenia Hatziangeli (AB-CO)
    11/05/2005, 16:20
    slides
    Applications for LHC hardware commissioning are being built as part of the development effort put in place since 2002 for the LHC era applications. For classic operations, like Power Converters controls, we aim to reuse the software developed for TI8. At the same time a huge effort is underway to introduce new industrial controls for the supervision of several important systems like...