EGEE-SA1-SWE Reports

→ Europe/Zurich
VRVS Virtual Room (http://www.vrvs.org)

VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
Description
No meeting today. Only site reports are attached.
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE/PIC)
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: https://services2.pic.org.es/devel/download/txt/SR-SWE-Template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      • CESGA-EGEE 15m
        Speaker: Fontan, Javier
      • CIEMAT-LCG2 15m
        Speaker: Calonge, Javier
      • CNB-LCG2 15m
        Speaker: Jose R. Valverde (IFIC-CNB)
      • IFCA-LCG2 15m
        Speaker: Cano, Dani
      • IFIC-LCG2 15m
        Speaker: Sanchez, Javier
      • INTA-CAB 15m
        Speaker: Huedo, Eduardo
      • LIP-LCG2 15m
        Speaker: David, Mario
      • IFAE 15m
        Speaker: Borrego, Carlos
      • PIC 15m
        Speaker: Borrego, Carlos
      • UAM-LCG2 15m
        Weekly Operations Status Report: [ UAM-LCG2 ] Reporting Period: [ 06/08/05 ] till [ 11/08/05 ] Availability of Core Services Hosted in the Site ================================================== MyProxy [OK] VOServer [OK] RB [OK] BDII [OK] Non-Functional Time ==================== none Scheduled Down Time =================== 2005-08-17 07:00:00 till 2005-08-17 11:00:00 2005-08-18 13:50:00 till 2005-08-18 15:00:00 2005-08-19 07:00:00 till 2005-08-19 11:00:00 Annual Maintenance of UAM Electrical Power Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? [when the LCG-2_6_0 is OK for Quattor.] By when will the WNs in the Site be upgraded? [when the LCG-2_6_0 is OK for Quattor. ] Installation with QUATTOR (without yaim) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Pardo Navarro, Juan Jose
      • UB-LCG2 15m
        Speaker: Graciani, Ricardo and Casajus, Adrian
      • UPV-GRyCAP 15m
        Speaker: Caballer, Miguel
      • USC-LCG2 15m
        Speaker: Saborido, Juan
      • BIFI-LCG 15m
        Weekly Operations Status Report: BIFI Reporting Period: 8/8/2005 to 12/8/2005 Availability of Core Services Hosted in the Site ================================================== No core services running at BIFI Non-Functional Time ==================== One SFTs run by GOC failed: [CT] 2005-08-09 06:05:24 It seems to be an "aleatory" error. Since the subsequent SFTs resulted OK with no change in our configuration. Some SFTs run by CESGA failed. Some of them seem to be "false positives" (failed as well in the rest of the federation): [JL] 2005-08-08 09:11:02 [JL] 2005-08-08 21:10:57 Some others seem to be "aleatory" fails: [CT] 2005-08-08 18:11:01 [CT] 2005-08-09 07:10:59 [CT] 2005-08-11 04:11:00 Scheduled Down Time =================== No scheduled down time intervals during the reporting period neither expected in the coming days. Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (running SL 3.0.4) By when will the WNs in the Site be upgraded? Already done (running SL 3.0.4) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Losilla Anadon, Guillermo (BIFI)
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      Speaker: Rey Mayo, Pablo (CESGA)