EGEE-SA1-SWE Meeting

→ Europe/Zurich
VRVS Forest Virtual Room

VRVS Forest Virtual Room

Pacheco, Andreu
Description
* Present: Celso Martinez (IFCA), Farida Fassi (IFIC), Alvaro Fernandez (IFCA), Javi Lopez (CESGA), Santiago Gonzalez de la Hoz (IFIC), Gonzalo Merino (PIC), Daniel Cano (IFCA), Pablo Rey, Francisco Bernabe (CESGA), Eduado Huedoce (INTA), Kai Neuffer (INTA), Carlos Borrego (PIC), Mario David (LIP), Javier Sanchez (IFIC), Javi Fontan (CESGA), Marc Rodriguez (PIC), Jorge Gomes (LIP), Carlos Fernandez (CESGA) * Apologies received from: Pepe Salt (IFIC)
    • 12:30 → 12:45
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE/PIC)
      more information
    • 12:35 → 12:50
      Operational status from sites 15m VRVS

      VRVS

      Focuses on the upgrade to LCG 2.3. The milestone is the end of january. After this date all sites running LCG 2.2 or earlier will appear as FAILED in the monitoring.
      Speaker: Merino, Gonzalo (PIC)
      document
      more information
      • CESGA 15m
        Power cut today. Working in the update of the LCG version. Installed on development testbed. Upgrade estimated at the end of january.
      • CIEMAT-CMS 15m
        Nobody connected.
      • CNB 15m
        Nobody connected
      • IFCA-CMS 15m
        Still in downtime. Very busy in computer center. New hardware and complete change of networking adressing and routing. Upgrade to new LCG version delayed until the system would be stable, perhaps end of january. Downtime in the GOC is updated to 22nd January.
      • IFIC-ATLAS 15m
        A lot of IFIC running in our farm, the load comes from data challenge jobs and local user jobs. This delayed the upgrade. The upgrade will include replacement of OpenPBS by Torque + MAUI
      • INTA-CAB 15m
        Some operational problems since 22 january, now solved. Upgraded succesfully to LCG 2.3 with some issues on RGMA.
      • LIP 15m
        Mario David reporting. Problems with web services sent to LCG-ROLLOUT list. The testbed seems to working properly. LIP is up and running LCG 2.3 Three tasks open from savannah site support: * Problem with the extensions glue schema being sent in spanish in UPC-Valencia. * RGMA problem in CNB-Madrid - To be closed today. * RGMA problem in UB-Barcelona - To be followed.
      • PIC 15m
        Carlos Borrego reporting. Running LCG 2.3
        Speaker: Merino, Gonzalo (PIC)
      • UAM-ATLAS 15m
        Nobody connected
      • UB-LHCB 15m
        Nobody connected
      • UPV 15m
        Nobody connected
      • USC-LHCB 15m
        Nobody connected.
    • 12:40 → 12:55
      Instalacion GridIce en CESGA 15m VRVS

      VRVS

      They installed GridICE last november for their monitor web site (http://www.egee.cesga.es/EGEE-SA1-SWE/monitoring/). He has added links in that web page to the GridIce web (http://www.egee.cesga.es/gridice). Several sites (PIC, LIP) report that the storage announced by this web page is not correct, there is an issue tracing how GridIce gets storage information. Open action on Javi Lopez to check that the information in the MDS correspond to what GridICE reports. Probably the problem is that the storage announced to each VO is added when really corresponds to the same storage. Beautiful geographical views with site overall information and very useful summarized information from all sites and VOs for the SWE area. Francisco will send to the list the instructions to allow GridIce to get details about site site specific information.
      Speaker: Bernabe, Francisco (CESGA-Santiago)
      more information
    • 12:45 → 13:00
      Change of time next week from 12h30 to 12h 15m VRVS

      VRVS

      * Now approved for next week. * Gonzalo Merino has requested if the weekly meeting can be moved to friday due to the proximity to the Operations Meeting all mondays at 14h. The fact is that Gonzalo has to send the site status by mail at 11am on Mondays before the SWE meeting, so information can be inacurate. * Opened action 5.1.24.3 to move the meeting to friday or search for an alternative.
      Speaker: Pacheco, Andres (IFAE)
    • 12:50 → 13:05
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.1.17.1 Incorporation of site managers from USC-Santiago, CIEMAT-Madrid, UAM-Madrid and UB-Barcelona to the SWE list (CLOSED) 15m
        Status - Done 24 Jan 00:30am
        Speaker: Pacheco, Andreu (IFAE)
      • 5.1.17.2 IFCA and INTA to send the list of experts for SWE Support to Farida Fassi (OPEN) 15m
        * Done for LIP-Lisboa, PIC-Barcelona, IFIC-Valencia and CESGA-Santiago. * Pending for IFCA-Santander and INTA-Madrid.
        Speaker: Fassi, Farida (CSIC/IFIC)
      • 5.1.17.3 All members to propose new support groups for SWE to Farida Fassi (CLOSED) 15m
        * The limit to propose new support groups was set to Jan 21st, 2005. The definitive list must be approved Jan 24th, 2005 * Only IFCA sent the comments to the list to Farida
        Speaker: Fassi, Farida (CSIC/IFIC)
      • 5.1.17.4 Andreu Pacheco to update the SWE Execution Plan (PENDING) 15m
        Status : pending
        Speaker: Pacheco, Andres (IFAE)
      • 5.1.17.5 All sites except LIP and IFIC to support SWETEST Virtual Organization (PENDING) 15m
        * Done for LIP and IFIC * CESGA and INTA will do it after LCG upgrade.
        Speaker: Pacheco, Andres (IFAE)
      • 5.1.17.6 CESGA, CIEMAT, CNB, IFCA, IFIC, UAM, UB to upgrade to LCG 2.3 (PENDING) 15m
        * Done by LIP, PIC, USC and UPV
        Speaker: Merino, Gonzalo (PIC)
      • 5.1.17.7 All sites to upgrade worker nodes to Scientific Linux 3.0.2 (PENDING) 15m
        * Delayed due to LCG 2.3 upgrade
        Speaker: Merino, Gonzalo (PIC)
      • 5.1.17.8 CIEMAT, CNB, IFCA, UAM, UB, UPV and USC to upgrade Apel version 3.4.39-1 (PENDING) 15m
        * Done for CESGA, IFIC, PIC and LIP * Done but not tested by INTA. * Sites must send an email to egee-admin@cesga.es once they have updated.
        Speaker: Lopez Cacheiro, Javier (CESGA)
        more information
      • 5.1.24.1 Javi Lopez to cross-check GridIce information published by CESGA (OPEN) 15m
        * The CESGA GridIce web site is located at http://www.egee.cesga.es/gridice/ * Data is inconsistent if the same storage element or computer element is serving more than one VO. * Sites are encouraged to send their comments about the information published by GridICE to egee-sa1@cesga.es
        Speaker: Bernabe, Francisco (CESGA)
      • 5.1.24.2 Farida Fassi to deploy the SWE support site (OPEN) 15m
        * List of supporter groups complete. * Now deploying the ticketing software.
        Speaker: Fassi, Farida (IFIC-Valencia)
      • 5.1.24.3 Andreu Pacheco to search for a solution to operation reporting on Mondays (OPEN) 15m
        * Gonzalo Merino has requested if the weekly meeting can be moved to friday due to the proximity to the Operations Meeting all mondays at 14h. The fact is that Gonzalo has to send the site status by mail at 11am on Mondays before the SWE meeting, so information can be inacurate.
        Speaker: Pacheco, Andreu (IFAE)