EGEE-SA1-SWE Meeting

→ Europe/Zurich
VRVS Virtual Room (http://www.vrvs.org)

VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
Description
Present: Andreu Pacheco (IFAE/PIC), Pablo Rey (CESGA), Mohammed Kaci (IFIC), Carlos Borrego (PIC), Mario David (LIP), Javier Sanchez (IFIC), Kai Neuffer (INTA), Marc Rodriguez (PIC), Gonzalo Merino (PIC), Daniel Cano (IFCA), Fco. Bernabé (CESGA), Javier Lopez (CESGA), Alvaro Fernandez casani (IFIC), Javi Fontan (CESGA), Juan Jose Saborido (USC), Guillermo Losilla (BIFI) and Javier Palacios (IFIC).
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE/PIC)
      more information
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: https://services2.pic.org.es/devel/download/txt/SR-SWE-Template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      • BIFI-LCG 15m
        Weekly Operations Status Report: BIFI Reporting Period: 26/9/2005 to 30/9/2005 Availability of Core Services Hosted in the Site ================================================== No core services running at BIFI Non-Functional Time ==================== Several SFTs run by GOC failed along the reporting period: [CT] From 2005-09-26 00:05:22 to 2005-09-26 18:06:03. Related to the network problems reported last week. It should be solved now. [CT] 2005-09-28 06:05:58, 2005-09-29 03:05:33, 2005-09-29 21:06:02. Seem to be random failures in the tests. We will investigate it... Scheduled Down Time =================== No scheduled down time intervals during the reporting period nor expected in the coming days. Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (running SL 3.0.4) By when will the WNs in the Site be upgraded? Already done (running SL 3.0.4) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Losilla Anadon, Guillermo (BIFI)
      • CESGA-EGEE 15m
        * Javi Fontan reporting. * All OK.
        Speaker: Lopez, Javier
      • CIEMAT-LCG2 15m
        Weekly Operations Status Report: CIEMAT-LCG2 Reporting Period: 24/09/05 to 30/09/05 Availability of Core Services Hosted in the Site ================================================== There is no core services running at CIEMAT at this moment Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 * Scheduled Maintenance During the Next Reporting Period 0 Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to LCG 2.6.0 ==================== We are still involved in SC3 but there are several problems delaying tests. So we expect got a couple of days to upgrade to 2.6.0 in the next two weeks Points to Raise at the Operations Meeting ========================================= None
        Speaker: Calonge, Javier (+34913466000 Ext: 6802) (CIEMAT)
      • CNB-LCG2 15m
        * No report.
        Speaker: No contact person
      • IFCA-LCG2 15m
        * Dani Cano reporting. * They had to change last week a switch last Tuesday or Wednesday. After the replacement everything was OK.
        Speaker: Cano, Dani
      • IFIC-LCG2 15m
        * Javier Sanchez reporting. * Minor problems with BDII updating and SFT tests. Now solved. -- Weekly Operations Status Report: IFIC-LCG2 Reporting Period: 28/09/2005 to 3/10/2005 Availability of Core Services Hosted in the Site RB: lcg2rb.ific.uv.es (public use) [OK] RB: lcg2rb2.ific.uv.es (ATLAS production) [OK] BDII: lcg2bdii.ific.uv.es (test zone) [OK] BDII: isn04.ific.iv.es (ATLAS production) [OK] PROX: lcg2proxy.ific.uv.es [OK] Non-Functional Time None Scheduled Down Time * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period SFT tests cotinue to fail randomly on APEL test.
        Speaker: Sanchez, Javier
      • INTA-CAB 15m
        Weekly Operations Status Report: INTA-CAB Reporting Period: 26/09/05 to 30/09/05 Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== 0 days. Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 days. * Scheduled Maintenance During the Next Reporting Period 0 days. Major Operational Issues Encountered During the Reporting Period ================================================================ INTA-CAB-PPS glite 1.3 installation: 1 RGMA-SERVER (MON) (rgma10.inta.es) 1 WN (wn101.inta.es) 1 CE (ce10.inta.es) 1 UI (ui10.inta.es) Added new Database Entry en GOC for INTA-CAB-PPS Upgrade to Scientific Linux 3 (or equivalent) ============================================= Already done. Points to Raise at the Operations Meeting ========================================= None.
        Speaker: Huedo, Eduardo
      • LIP-LCG2 15m
        Weekly Operations Status Report: LIP Reporting Period: 26/09/05 to 02/10/05 Availability of Core Services Hosted in the Site ================================================== RB: rb02.lip.pt PX: px01.lip.pt BDII: ii02.lip.pt LFC: lfc01.lip.pt Non-Functional Time ==================== Scheduled downtime on the 29 September for about 5 hours, hardware upgrading of the SE. The rest of the time it was OK Points to Raise at the Operations Meeting ========================================= None
        Speaker: David, Mario
      • IFAE 15m
        * Carlos Borrego reporting. * Problems with the information system. Weekly Operations Status Report: [ IFAE ] Reporting Period: [ 26/09/05 ] to [ 02/10/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: ifaece02.ifae.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 days Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? done By when will the WNs in the Site be upgraded? done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos
      • PIC 15m
        Weekly Operations Status Report: [ PIC ] Reporting Period: [ 26/09/05 ] to [ 02/10/05 ] Availability of Core Services Hosted in the Site ================================================== ce01.ifae.es bdii01.pic.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ - Unable to see any chart on cesga's nor infn's GridIce Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Done By when will the WNs in the Site be upgraded? Done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos
      • UAM-LCG2 15m
        Weekly Operations Status Report: [ UAM-LCG2 ] Reporting Period: [ 26/09/05 ] to [ 29/09/05 ] Availability of Core Services Hosted in the Site ================================================== MyProxy [OK] VOServer [OK] RB [OK] BDII [OK] Non-Functional Time ==================== Problem with globus-mds. I solved this problem restarting the service. Scheduled Down Time =================== from 3-10-2005 to 9-10-2005 for upgrade to LCG-2_6_0 (rh7.3 --> sl305) and Maintenance of the hardware Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? [3-10-2005 to 9-10-2005] Points to Raise at the Operations Meeting ========================================= none
        Speaker: Pardo Navarro, Juan Jose
      • UB-LCG2 15m
        * No report received this week.
        Speaker: Graciani, Ricardo and Casajus, Adrian (UB)
      • UPV-GRyCAP 15m
        Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 26/09/05 ] to [ 30/09/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es -> 0 days Non-Functional Time ==================== - Total days unavailable: 0 Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0 day * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel (tel. +34 963877007 ext 88254) (GRyCAP-ITACA (UPV))
      • USC-LCG2 15m
        Hello. I am afraid there are at least a couple of reports missing from the USC-LCG2 site. Here it goes the one of last week: Weekly Operations Status Report: USC Reporting Period: 25/09/2005 to 02/10/2005 Availability of Core Services Hosted in the Site ================================================ None Deployed Non-Functional Time =================== None Scheduled Down Time =================== None Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already there By when will the WNs in the Site be upgraded? Already there Points to Raise at the Operations Meeting ========================================= None
        Speaker: Saborido, Juan
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      APEL STATUS REPORT == Period == From September 24 to September 30 == Summary == During this week, the Flexible Archiver has been down several days. This avoids publishing accounting data properly even if Apel is working fine in some sites. After this week this is the status of the federation related to accounting: * 6 sites have published their accounting data properly. * 6 sites have not published their accounting data due to the problem with the Flexible Archiver. * 1 sites is in Scheduled Maintenance * 1 site is not publishing their accounting since 04/08/05 There are some sites which don't have updated to LCG 2.6.0. If you need, in http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ApelInstallationNotesForYaim/apel-yaim.html you can found information about the configuration of Apel in LCG 2.6.0. == Status of each SWE site == Site: BIFI Solved Problems of Last Report: Yes Missing Accounting Entries: Since 23/09/05 to 29/09/05 Publishing User Name Information: Yes Actions: Check the Apel logs Other Comments: Probably they don't have published data due to a R-GMA Server problem Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: Since 23/09/05 to 29/09/05 Publishing User Name Information: Yes. They have published some old records without this information Actions: Check the Apel logs Other Comments: Probably they don't have published data due to a R-GMA Server problem Site: CNB Solved Problems of Last Report: NO Missing Accounting Entries: Since 06/08/05 Publishing User Name Information: NO. Since 30/07/05 they are no publishing this information Actions: None Other Comments: They are updating to LCG 2.6.0 Site: ifae Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: None Other Comments: None Site: IFCA Solved Problems of Last Report: NO Missing Accounting Entries: Since 04/08/05 Publishing User Name Information: Yes Actions: They should check the Apel log files Other Comments: They have updated to LCG 2.6.0 and they are having problems with the connection to the accounting database in the MON Site: IFIC Solved Problems of Last Report: NO Missing Accounting Entries: Since 22/09/05 to 29/09/05 Publishing User Name Information: Yes Actions: Check the Apel logs Other Comments: Probably they don't have published data due to a R-GMA Server problem Site: INTA Solved Problems of Last Report: Yes Missing Accounting Entries: Since 23/09/05 to 29/09/05 Publishing User Name Information: Yes Actions: Check the Apel logs Other Comments: Probably they don't have published data due to a R-GMA Server problem Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: Since 23/09/05 to 29/09/05 Publishing User Name Information: Yes. They have published some old records without this information Actions: Check the Apel logs Other Comments: Probably they don't have published data due to a R-GMA Server problem Site: pic Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UAM Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: NO. Since 30/09/05 they are no publishing this information Actions: Check the Apel configuration and republish their data. Other Comments: None Site: UPV Solved Problems of Last Report: NO Missing Accounting Entries: Since 21/09/05 to 29/09/05 Publishing User Name Information: Yes Actions: Check the Apel logs Other Comments: Probably they don't have published data due to a R-GMA Server problem Site: USC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None == Accounting Support == Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:30
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15m
        * Last week Mario sent a mail to sites to upgrades.
        Speaker: David, Mario (LIP)
      • 5.9.19.1 All sites to upgrade the gridice sensor in all machines (NEW) 15m
        * Done for CESGA, BIFI, LIP, PIC
        Speaker: Francisco Jose Bernabe Pellicer (CESGA)
      • 5.9.19.2 All sites to upgrade fmon2glue in gridice collector (NEW) 15m
        * Done for CESGA, BIFI, LIP, PIC
        Speaker: Francisco Jose Bernabe Pellicer (CESGA)
      • 5.9.19.3 Request for volunteers to test network monitoring with GridICE (NEW) 15m
        * Data is starting to be received from LIP. * No news
        Speaker: Francisco Jose Bernabe Pellicer (CESGA)
      • 5.9.19.4 All sites to feedback about GridICE e-mails (NEW) 15m
        * When a site changes status an email is sent by GridICE.
        Speaker: Francisco Jose Bernabe Pellicer (CESGA)
    • 12:20 → 12:35
      Preproduction Activity Status 15m VRVS

      VRVS

      This section will contain an update about the preproduction activity in SWE where more and more sites will be involved.
      Speaker: Pacheco, Andreu (PIC)
      • PIC Report 15m
        * Carlos Borrego reporting. * Not able to configure gLite CE to use the PIC Production Batch system as requested by cms.
        Speaker: Carlos Borrego (PIC)
      • CESGA 15m
        * Fco. Bernabé reporting. * Problems with UI.
        Speaker: Lopez, Javier (CESGA)
      • IFIC 15m
        * Alvaro reporting. * No big changes. * Reconfiguration last week to allow VOs to access SRM facility. * Services at 1.2 waiting to 1.4
        Speaker: Fernandez Casani, Alvaro (IFIC)
      • LIP 15m
        * Mario Reporting. * Living in 1.3 * They managed to put files in DPM (Distributed Pool Manager). * New colleague Gonçalo working in preproduction. * Waiting for 1.4
        Speaker: David, Mario (LIP)
      • INTA-CAB 15m
        * Kai Reporting. * Some nodes installed with 1.3. (UI,CE,WN,RGMA) * Same problems with Mario.
        Speaker: Kai Neuffer
    • 12:25 → 12:40
      Impressions from LCG/EGEE Operations Workshop 15m VRVS

      VRVS

      * This is a workshop organized 2-3 times a year. * Main discussions to make interoperable with US grid (OSG). * Issues how to make jobs flow between EU-US grids. Can be done now with a tricky way. The whole OSG appears as a single site in the GOC with all OSG sites. LCG jobs starting at OSG sites install a mini-LCG middleware in user space. * Proposals to use RGMA to publish all kind of monitoring metrics. * A lot of discussions in user support... in EU GGUS. Something similar in the States. A lot of discussions how to move tickets between grids. * LHC Experiments have requested the installation of VO Voxes accesible by the experiments software experts by GSI-SSH and they run middleware installed by the experiment itself. * Many sites reject the possibility of such VO-boxes. * A report sent by the security sets security requirements to such boxes. * This week feedback is requested to site admins as operations requirement. * Ongoing discussions with LCG production and gLite middleware deployment. Pre-production is still very far from production. A new testbed called "mix" will be set to test specifically gLite services replacing LCG middleware. * Monitoring tools are improving fast. * New service related to accounting.
      Speaker: Merino, Gonzalo (PIC)