09:00 Welcome - D. Macina 09:10 Luminosity monitor at IR1/IR5: integration, installation and expected performances - A. Ratti 09:50 Luminosity monitor and LHC operation - H. Burkhardt 10:30 Coffee break 10:50 LHCf detectors: integration, installation and operation - O. Adriani, Y. Itow 11:30 ATLAS ZDC: integration, installation and operation - S. White 12:10 CMS ZDC: integration, installation and operation - O. Grachov 12:50 Lunch
14:30 Simulation studies on absorbed and residual doses in the TAN and detectors - N. Mokhov 15:10 Handling of radioactive detectors and material - D. Forkel-Wirth, S. Roesler 15:50 Coffee break 16:10 Planning of the detectors installation - M. Gastal 16:40 Detectors transport and handling during installation - S. Prodon 17:10 Signal exchange - E. Tsesmelis 17:35 Summary and follow-up