JRA1-UK

Weekly Meeting

by Steve Fisher

→ Europe/Zurich
Norton Room

Norton Room

Description
<html> <head> <meta name="generator" content="HTML Tidy for Linux/x86 (vers 1st March 2002), see www.w3.org"> <title></title> </head> <body style="background-color: white;">
  • Reports on Meetings
    • None
  • Future Events
    • None
  • Actions
    • Write test specification. - John - 1/8/2005. Will be updated when the tests are stable
    • Write Distributed Full System tests - Rob and John - 31/10/2005
    • Reorganise design notes - John - 3/4/2006
    • JSP in the inspector - Rob - 3/4/2006
    • Schema update - Antony - 3/4/2006
    • Revise User Guides - Alastair - 3/4/2006
    • Inform Dave Kant of outcome of meeting from last week and our ideas on excrypting the DN - Steve F - 10/4/2006
    • Set up private list for us, leave the JRA1-UK list alone but advertise it as being a "discuss" list. Add an r-gma-announce list (loaded with jra1-uk list). Leave the R-GMA-SA1 list alone for now - Steve F - 10/4/2006
  • LCG - Antony
  • PPS - Antony
  • Bugs
    • #14164 Resilience test suite needs to be fully restartable - Rob
      • DONE but still in Savannah
    • #14677 gLite 1.5 server incompatible with gLite 1.4 java libraries - John
      • We will tidy up our pages - and then ask for this to be closed
    • #15883 timezone is not set correctly after setting the time forward 1 hour - Antony
    • # 15963 Problem with R-GMA-based service discovery on PPS - Steve
    • #16140 R-GMA Queries are slow - submitted by Stephen
    • #16401 Syntax checking
  • LCG support: Steve -> Rob
  • Plan for week ahead
</body> </html>
actionlist
minutes