LT2 Technical Support Group

Europe/Zurich
Imperial College, HEP, e532

Imperial College, HEP, e532

van der Aa, O
minutes
    • 1
      Glite 3.0 upgrade timetable
      Make a timetable for the Glite 3.0 upgrade. UCL-CENTRAL is upgrading. Feedback from them.
      Speaker: All
      • a) LT2 Sites status
    • 2
      Improving DPM performance
      How do we proceed to improve the DPM performance. See http://wiki.gridpp.ac.uk/wiki/Service_Challenge_Transfer_Test_Summary
      Speaker: All
    • 3
      Experience with current high Load
      http://tinyurl.com/lz3em
    • 4
      AOB