Outcome of series of beta* MD, proposal for configuration for 40cm (summarizing ABP inputs - coll, BB, impedance, and MPP constraints)
Alternative configurations (50cm? risk mitigation vs lumi gain)
Strategy Instabilities at injection, flat-top, squeeze, in collision. non-colliding bunches. E-cloud related limitations (filling scheme optimization), sensitivity to beam parameters (emittance, Ib, bunch length)… other available knobs? What diagnostics do we need to have in place?
First month of commissioning to first stable beams. Break down of commissioning steps per system. Include list of measurements for validation of final beta*. Preparation needed for scrubbing (high intensity at 450 GeV). MP intensity ramp up.