17/12/2015, 08:30
Outcome of series of beta* MD, proposal for configuration for 40cm (summarizing ABP inputs - coll, BB, impedance, and MPP constraints)
Alternative configurations (50cm? risk mitigation vs lumi gain)
Kevin Shing Bruce Li
17/12/2015, 08:55
Strategy Instabilities at injection, flat-top, squeeze, in collision. non-colliding bunches. E-cloud related limitations (filling scheme optimization), sensitivity to beam parameters (emittance, Ib, bunch length)… other available knobs? What diagnostics do we need to have in place?
Mirko Pojer
(CERN)
17/12/2015, 09:20
plus machine checkout. What needs to be done? When can we start? How long will it take?
Belen Maria Salvachua Ferrando
(CERN)
17/12/2015, 10:15
First month of commissioning to first stable beams. Break down of commissioning steps per system. Include list of measurements for validation of final beta*. Preparation needed for scrubbing (high intensity at 450 GeV). MP intensity ramp up.
Jan Uythoven
(CERN)
17/12/2015, 10:35
Very broad overview of results from 2015 and priorities going forward.
Include possible optimization on the use of the MD time