Protons: Updates on HL-LHC baseline and options (incl. staged implementation), performance reach, schedule

Not scheduled

Description

o Required baseline beam parameters at exit of SPS and during collision in the LHC. o Vibration studies and resulting effort to take hollow electron lens into HL-LHC Baseline (margins against losses due to cultural noise and earthquakes). o New schedule for the civil engineering and plan to finish underground excavation work within LS2 (surface buildings and infrastructure installations during Run3 and LS3). o Staged Crab Cavity installation (half in LS3 other half in LS4). o Presentation of IR layout (L*, magnet apertures, parameters and powering). o Decision to NOT install a new cryo plant in IR4. o Performance projections with new schedule (longer proton runs during Run5 and Run6).

Speaker

Gianluigi Arduini (CERN)