Speaker
Malika Meddahi
Description
Beam commissioning of the SPS to LHC transfer lines performed during the summer 2008 is reported. The emphasis is put on the optical checks measured for the first time in the last part of the lines and into the LHC. In particular, extensive trajectory studies, dispersion measurements and coupling analysis are discussed. These studies were conducted in parallel with hardware checks and the outcome is summarised.
Author
Malika Meddahi