2–6 Feb 2009
Chamonix
Europe/Zurich timezone
DISCLAIMER “The Chamonix workshop was an open exchange of views and opinions. All the presentations made at the workshop are available here. The views expressed in individual presentations do not necessarily represent those of the CERN management.”

First Results from the LHC Beam Instrumentation Systems

5 Feb 2009, 11:05
20m
Le Majestic (Chamonix)

Le Majestic

Chamonix

Speaker

Rhodri Jones

Description

During the 2008 LHC injection synchronisation tests and the subsequent days with circualting beam, the majority of the LHC beam instrumentation systems were capable of measuring their first beam parameters. This included the two large, distributed, beam position and beam loss systems, as well as the scitillating and OTR screen systems, the fast and DC beam current transformer systems, the tune measurement system and the wire scanner system. The fast timing system was also extensively used to synchronise most of this instrumentation. This presentation will comment on the results to date, some of the problems observed and the improvements to be implemented before the next LHC run.

Author

Rhodri Jones

Presentation materials