GIF++ installation and schedule meeting

→ Europe/Zurich
892/1-B09 (CERN)

892/1-B09

CERN

30
Show room on map
Roberto Guida (CERN)

### October 28: concrete door closed

Only activities in free or key access.

 

### November 4: concrete door: do we need to open? Any request should arrive by Friday late afternoon to Nicolas Bourgeois.

Roberto out of cern. I will ask Federico to chair the meeting.

 

EHN1 Buffer Zone Operation: How to move material out of the GIF bunker

https://gif-irrad.web.cern.ch/gif-irrad/ see navigation bar for “EHN1 Buffer Zone Operation”, which indicates all details.

 

 

 

 

 

 

Wed:

Thu:  

Fri

Sat

Sun

Mon

Tue

Wed

There are minutes attached to this event. Show them.
    • 09:00 → 09:10
      Beam trigger status - scintillators 10m

      Roberto:

      Scintillators reinstalled last Wednesday as expected.

      A lot of time spent in trying to understand the issues:

      -PMT for downstream scintillator replaced, signals are now ok but still no good coincidences

      -on CESAR there is info about scintillators. Are these something EN has installed (as it is the case for other test zones, i.e. PPE134) or not?

      -waiting from Adrian to react to our requests of info (Run coordinators in cc) 

       

       

      Difficult to understand who is the responsible person in AIDA.

      Discussion ongoing with Michael Moll (AIDA CERN responsible) and Davide Boscherini

      Yan confirmed that he is NOT available.

       

       

    • 09:10 → 09:20
      Water cooling- compressed air and HVAC system 10m

      Roberto:

      EN-MEF (Adrian) is going to contact the responsible team for the HVAC project. He is expected to report to us about news as soon as possible

       

      Water cooling and compressed air: location of distribution manifolds was defined long time ago with EN-CV. Info, re-sent to Adrian and EN-CV. On-site meeting Wednesday 28 at 11am

       

    • 09:20 → 09:35
      Report from Run coordinators 15m
      Speakers: Katerina Kuznetsova (B.P. Konstantinov Petersburg Nuclear Physics Institute - PNPI (), Sebastian Nowak (Max-Planck-Institut fuer Physik (Werner-Heisenberg-Institut) (D)

      October 21-28 Katerina-Sebastian

      October 28-November 2:

      Working days: Nicolas Daniel

      weekend Iuri-Ignacio

    • 09:35 → 09:55
    • 09:55 → 10:00
      Update: reference person, patrol rights and status for each setup 5m
      Please send to me the file with the update information. Please let me know also in case of no change.
    • 10:00 → 10:20
      Beam request for 2016 20m
      Internal deadline: Monday November 2nd
      Speaker: Roberto Guida (CERN)