1) SPS LSS1/LSS5 layout proposals for LS2:

- Likely all BBLR can be removed (cooling cables included) by LS2 (H, Schmickler to confirm with ABP)

- Integrated and prompt dose values downstream of QD519 to be confirmed (E. Carlier with SC/RP)

- Question about aperture for Fast/DC BCTs on girder (inverse Fast and DC?) (OP-SPS to confirm if needed)

- Detailed planning for dismantling and cabling work to be done similar to what was done in LSS1 during LS1 (J. Coupard)

- SRR documents expected released in EDMS before Easter 2016

- BI (PM/BL) to look into optimal positions for beam size measurement systems (G. Trad et al)

- BI to refurbish TFD tank and monitors

- General cost estimates to be produced before end of 2016 (Rhodri and SLs)

2) AD/ELENA CCC system:

- Issue with on-line B-train normalisation prevents current->intensity (charges)

- RF by-pass optimisations to be made (M. Wendt proposes to help)

- Main issue with cryo-cooler - delays could mean no measurements during 2016 (J. Tan to present at IEFC)

3) Python based BOAF:

- Application has been developed to ease data retrieval

- Very limited use seen in BI so propose to delay further developments (parallel tools being developed in BI sections?)

- Regular updates during BI-TB meetings (JJ Gras) with strange/interesting observations

- BI-day presentation proposed (B. Kolad)

4) PS BCW cabling

- New layouts proposed - needs agreement from BE-OP-PS and BE-RF

- EDMS document proposed describing the situation and evolution