3–7 Oct 2016
ESRF
Europe/Zurich timezone

Several components of alignment system of electron positron injector linac in KEK

Not scheduled
15m
Auditorium (ESRF)

Auditorium

ESRF

71 avenue des Martyrs 38000 Grenoble France
POSTER

Speaker

yoshinori enomoto (KEK)

Description

Improvement of alignment system of injector linac is a one of major issue in the upgrade plan for SuperKEKB project, in which very low emittance high charge injection beam is required. To suppress the emittance growth during acceleration and transportation, it is naively required to align all the components within 0.1 mm from the ideal position locally (20-30m range) and 0.3 mm globally (500 m). To realize these requirements, position measurement of girders using He-Ne laser and quad-divided photo diode sensors is under progress. Expansion joint of the tunnel is monitored by dial gauge. A new magnet support using screw jack and a mover mechanism which is compatible with existing girder are under test.

Author

Co-authors

Presentation materials

There are no materials yet.