Speaker
Mr
Michael Gaydosh
(SLAC National Accelerator Laboratory)
Description
This poster presents the survey and alignment activities at the SLAC National Accelerator Laboratory since 2014. The major projects during the last two years have been a revised coordinate system for the SPEAR3 ring, changing the monumentation in the SLAC Linac from a girder based system to a monument based system and the reconfiguration of the Linac Laser Alignment System in preparation for LCLS II installation. A variety of smaller projects are also under way. This poster will give a brief overview of the various projects and the actual implementations in the field.
Author
Georg Gassner
(SLAC National Accelerator Laboratory)
Co-authors
Mr
Brian Fuss
(SLAC National Accelerator Laboratory)
Mr
Michael Gaydosh
(SLAC National Accelerator Laboratory)