AWAKE BPM

  • Spec
    • Single bunch 5E9 to 3.5e11 (37dB)
    • 100um resolution with 50um near plasma cell
  • System
    • 4 BPK, 21 button
    • F-E electronics in tunnel
    • Series communication via copper links or optical fibres
  • F-E Electronics
    • 800MHz LP adapters
    • 77MHz LP + 20MHz BP
    • Log Amp which produces sum & difference internally
  • Acquisition
    • Sampling at 40MS/s
  • Tests
    • Slope changes slightly with intensity
      • Due to DC coupling or LogAmp characteristics
    • Button - 1dB ~1mm
      • For high intensity achieve ~50um resolution
      • For low intensity achieve ~500um resolution
    • Added amplifier to increase signal for low intensity
  • Status
    • 100 Adapters under production
    • 30 F-E crates & PS ready
    • 50 ADC boards to be tested
    • 60 Log-amp boards under production
    • Firmware
      • Transmission protocol complete
      • Data processing under development
  • Installation and hardware commissioning:
    • TT41 installation foreseen early May
    • Transfer-line accessed from SPS will have to wait technical stop (early June)
    • (First beam tests foreseen July)

FBCT Calibration

  • WCM internal PCB
    • Beam current
      • Low impedance & good RF performance
    • Calibration path
      • Low DC resistance & high RF impedance to decouple from beam
      • Made for calibration with current
  • Beam coupling to calibration winding introduces error to beam current measurement
    • Decoupling with ferrite beads (-30dB @ 40MHz)
  • For 2016 using DABs & IBMS
    • Cross calibration with DCCTs
    • Bench top 5us square pulse generator for cross channel correction
  • For future with FMS ADCs
    • Only need amplitude
    • Precise calibration only with current source
      • Slow pulses tens of us
    • Low load is essential to avoid power dissipation in PCB
  • Proposal for new calibrator - first version
    • Use 1 current source with switches to distribute between WCMs
    • Current source with 10ppm shot-to-shot stability
    • 100ppm accuracy
    • 5us switch-on-time
    • 1.5A for R-cal 10 Ohms & R-ref 5 Ohms
      • Could increase current if R-ref is reduced (Hermann)
    • Current measurement using half-bridge principle
      • Know Vref with Rref & zero bridge
      • Rely on zero measurement - offsets?
  • Next version
    • Controls
    • Internal ADCs to monitor reference voltage
  • Further discussion:
    • Cross check calibration with antenna measurement
    • How to calibrate at 1% of full scale with this generator?
    • Should not have ethernet connection to avoid calibration with beam present
      • WCM will be used for dI/dt in 2016

LHC Status:

  • Question about new BPM firmware to be decided shortly
  • Present schedule says first beam week after Easter (25/3)
  • Likely some transfer-line shots during week before Easter if possible.