AWAKE BPM
- Spec
- Single bunch 5E9 to 3.5e11 (37dB)
- 100um resolution with 50um near plasma cell
- System
- 4 BPK, 21 button
- F-E electronics in tunnel
- Series communication via copper links or optical fibres
- F-E Electronics
- 800MHz LP adapters
- 77MHz LP + 20MHz BP
- Log Amp which produces sum & difference internally
- Acquisition
- Tests
- Slope changes slightly with intensity
- Due to DC coupling or LogAmp characteristics
- Button - 1dB ~1mm
- For high intensity achieve ~50um resolution
- For low intensity achieve ~500um resolution
- Added amplifier to increase signal for low intensity
- Status
- 100 Adapters under production
- 30 F-E crates & PS ready
- 50 ADC boards to be tested
- 60 Log-amp boards under production
- Firmware
- Transmission protocol complete
- Data processing under development
- Installation and hardware commissioning:
- TT41 installation foreseen early May
- Transfer-line accessed from SPS will have to wait technical stop (early June)
- (First beam tests foreseen July)
FBCT Calibration
- WCM internal PCB
- Beam current
- Low impedance & good RF performance
- Calibration path
- Low DC resistance & high RF impedance to decouple from beam
- Made for calibration with current
- Beam coupling to calibration winding introduces error to beam current measurement
- Decoupling with ferrite beads (-30dB @ 40MHz)
- For 2016 using DABs & IBMS
- Cross calibration with DCCTs
- Bench top 5us square pulse generator for cross channel correction
- For future with FMS ADCs
- Only need amplitude
- Precise calibration only with current source
- Low load is essential to avoid power dissipation in PCB
- Proposal for new calibrator - first version
- Use 1 current source with switches to distribute between WCMs
- Current source with 10ppm shot-to-shot stability
- 100ppm accuracy
- 5us switch-on-time
- 1.5A for R-cal 10 Ohms & R-ref 5 Ohms
- Could increase current if R-ref is reduced (Hermann)
- Current measurement using half-bridge principle
- Know Vref with Rref & zero bridge
- Rely on zero measurement - offsets?
- Next version
- Controls
- Internal ADCs to monitor reference voltage
- Further discussion:
- Cross check calibration with antenna measurement
- How to calibrate at 1% of full scale with this generator?
- Should not have ethernet connection to avoid calibration with beam present
- WCM will be used for dI/dt in 2016
LHC Status:
- Question about new BPM firmware to be decided shortly
- Present schedule says first beam week after Easter (25/3)
- Likely some transfer-line shots during week before Easter if possible.
There are minutes attached to this event.
Show them.