Consolidation of access system for the injector complex

5 Mar 2009, 16:00
30m
AT Auditorium (CERN)

AT Auditorium

CERN

Speaker

Pierre Ninin

Description

In 2008 The ASE group started a project for the renovation of the PS Access system, this concerns the safety interlocks as well as the access control functionalities. In collaboration with BE/OP, the specification of the new system is progressing, covering aspects such as preliminary risk analysis, definition of the safety functions, access sectorisation, definition of the Important Machine Safety Elements. In 2009 the work will focus on the validation of the specification by the various stakeholders and the design of a system architecture based on the LHC Access project experience, the technological evolution and the need for urgent renovation of some part of the system. The project will be organized in two main stages: the first one will deal with the design installation and validation of the access safety and access control infrastructure, the second one will cover the migration of each PS machine in the new infrastructure. This new system will cope with the need of the LINAC 4 project.

Presentation materials