Davide Bozzini
Description
After a short introduction we will look at the status of the 18 kV cables networks, report case by case the source and nature of the problems encountered in 2008 and explain the corrective and preventive actions taken. The status of the SPS consolidation plan of the 18 kV network will be reviewed. The activities scheduled for the period 2009-2010 to continue with the consolidation will be presented and discussed.