• Packaging estimate.
• Handling equipment.
• Temporary structure and removal.
• Subassembly required with ground planes.
• Mounting onto CPA.
• Access needed and plans.
• Top is 3.6 m full assembly and bottom is 2.5 reduced assembly to mount on vertical CPA panel.
• Deploy panels inside cryostat. Top panel – lifting hardware, latching devices, electrical, removal of hardware. Bottom panel – lowering hardware, addition of 1.1 m section, electrical, access platform on top of panel, removal of hardware.
• Electrical connections.
• Any test of electrical connections after installation inside the cryostat?