Offline weekly meeting

→ Europe/Zurich
160/R-009 (CERN)

160/R-009

CERN

20
Show room on map
Alex: - fix in the dEdxSigma needed - no additional members of AOD (decided) - the AOD problems to be reported to Savannah and addressed in new tags Adam: - investigation of the discontinuity in the Zvertex ITS (v4-15-Release?). Most probably from the 3 sigma cut on the simulated vertex. - asymmetric tails in the Xvertex. To be investigated. - QA plot: N TPC clusters vs N clusters has strange modulation. To be investigated. Panos: - investigation of the discontinuity in the Zvertex TPC - again sharp cut on Z~12cm => this is the 3 sigma cut on the vertex generation - the efficiency for pbar from Lambdabar is twice bigger than the one for protons from Lambda decays (no PID). Blocker! - strange increase in the contamination for TPC stand-alone PID. To be investigated. - check the number of Lambdas and anti Lambdas Ana: - the high PID probability of misidentified pions as electrons is because of the change in the gain. Some thresholds have to be changed, the fix is to be committed to the trunk and ported to v4-16-Release. See bug #47500 - HMPID tracks that have wrong TRD refit bit. The fix is under tests, the problem will be submitted to Savannah Francesco: - the fix of Marian reduces the dE/dx dependence on eta from 8-10% to 3%. We have to port it to the release. Federico: - August: cosmic run - September: LHC startup - October: 900 GeV - ASAP 10TeV - No shutdown until September 2010 => 10Pb of data: no possibility to store. Max average rate 100MB/s. Strategy: take data, analyse, throw, take new data. Peter: the notes and the decisions are in the updated presentation.
There are minutes attached to this event. Show them.