LCG Service Coordination Meeting
-
-
10:00
→
10:05
Introduction 5m
-
IT Service Status board and announcements to 'the Grid' 5mThe IT Service Status board is used for a wide range of announcements: don't drink the water to CASTOR down (for example).
Some of these have signficant implications to Grid users outside CERN and should therefore be announced accordingly.
There is the possibility to inform people by mail of new postings, who could then decide whether the information is relevant for people outside. (e.g. GMOD, SMOD).
http://it-support-servicestatus.web.cern.ch/it-support-servicestatus/
-
Schedule for reinstallation of service nodes 10m
-
Status of Oracle cached cursor syndrome and affected applications 10m
-
WLCG MoU Targets & Service Implications 15mThe WLCG MoU defines the maximum delay in responding to operational problems (service interruption; degradation >50%; degradation >20%), as well as the average availability measured on an annual basis.
However, these are for 'raw data recording', 'distribution of data to Tier1 centres during accelerator operation' etc, which obviously depend on multiple services.
We should agree which services map to the corresponding 'WLCG service' and understand how the targets could be met and corresponding requirements.
This would then lead to a paper to the IT Physics Service Meeting and / or WLCG MB.
-
-
10:05
→
11:05
Regular Status Review of areas for which a report has been provided! 1h
-
Deployment 10mSpeaker: Louis Poncet
-
Workload Management 10mSpeaker: Thorsten Kleinwort
-
Data Management 10mSpeaker: Gavin McCance
-
Information and Monitoring 10mSpeaker: Piotr Nyczyk
-
Authentication and Authorisation 10mSpeaker: Maria Dimou
-
<a href="https://twiki.cern.ch/twiki/bin/view/LCG/GmodRoleDescription">GMOD</a> report 10mSpeaker: Grid-Manager-on-Duty (GMOD)
-
Experiment Issues 10mSpeaker: EIS Team
-
-
11:05
→
11:10
Any Other Business 5m
-
What can realistically be delivered in production to experiments on timescale of Q3 and/or Q4 2006. 15m
-
Deployment of Oracle Security patch (rolling upgrade not possible) 15m
-
-
10:00
→
10:05