    • 16:00 → 16:05
      Approval of the minutes 5m
      Speaker: Julie Coupard (CERN)
    • 16:05 → 16:10
      LIU-PLI Follow-up 5m
      • Follow-up on the SRRs and ECRs
      Speaker: Julie Coupard (CERN)
    • 16:10 → 16:25
      LIU-PS ECR (EDMS 1606410) Installation of Beam Gas Ionisation (BGI) Beam Profile Monitor for the PS Ring 15m

      The Beam Gas Ionisation (BGI) profile monitor will provide continuous non-destructive bunch-by-bunch measurement of the horizontal beam profile. The instrument will be installed in PS Straight Section #82, replacing the existing beam vacuum pipe. The purpose of the installation is to evaluate the new pixel detector based BGI design.

      Speaker: James Storey (CERN)
    • 16:25 → 16:40
      LIU-PSB SRR PSB-LJ-EC-0007 (EDMS 1612378) Space Reservation Request - New PS Booster Absorber in Period 8 15m

      This document describes the requested space for the future Booster absorber aiming at replacing the present Windows Beam Scope (WBS).

      Speakers: Francois-Xavier Nuiry (CERN), Giulia Romagnoli (CERN)
      SRR
    • 16:40 → 16:55
      LIU-PSB ECR PSB-LJ-EC-0008 (EDMS 1643409) New MPS for LIU Booster (POPS-B) 15m

      For the LIU Booster project the replacement of the present PSB-MPS with a new one (POPS-B) is needed. It will be installed in a new building (b245) under realization in the area in front of b271. Contributions from EN-CV, EN-EL, TE-MSC, EN-HE and SMB are required for the construction of the new building and for the cabling and cooling of the new MPS and installation of the new reference magnet. This ECR lists all the activities to be foreseen and the planning required.

      Speaker: Fulvio Boattini (CERN)
      ECR
    • 16:55 → 17:05
      LIU-SPS ECR SPS-JSL-EC-0001 (EDMS 1690435) Removal of synchrotron masks from SPS sextupole magnets 10m

      During an inspection to study the feasibility of bypassing enamelled flanges in SPS it was observed old synchrotron masks were still installed. This ECR proposes to remove them.

      Speaker: Jose Antonio Ferreira Somoza (CERN)
      ECR
    • 17:05 → 17:10
      AoB 5m