•Powering phase I at low current: How to ensure that the current does not exceed the “safe” value?
•Powering phase II: How can we be sure that nobody is in when we power?
•Underground access during powering phase I and II for interventions: How to ensure that we do not power a circuit during such intervention (such as with the PIC)?
•Underground access during commissioning of the powering system? Is it required? (EE switches, cut water, triplet…)
•Hardware commissioning using the access system
•Set the rules for access, different modes, transition from shutdown to commissioning/operation