19 March 2009
CERN
Europe/Zurich timezone

Session

Session 1: General Overview

0
19 Mar 2009, 08:30
AT Auditorium (CERN)

AT Auditorium

CERN

Presentation materials

There are no materials yet.

  1. Rüdiger Schmidt
    19/03/2009, 08:30
    •Scenarios: commissioning to 450 GeV and 4…5 TeV, high currents only to 4TeV initially •How to decide to go to 5 TeV? •What about circuits with “small” current? 4 TeV- 5 TeV? •Key dates in preparation and outlook to planning •LHC operation during the winter 2009/10
    Go to contribution page
  2. Reyes Alemany Fernandez
    19/03/2009, 08:55
    •Overview: what changed during the shut-down? Modification to the powering system? •Impact of sector 34 repair on ELQA, inductance tables, ….. •Parameters, ramp speed and acceleration •Update of installation of nQPS, UPS •Other modification: DN200, others
    Go to contribution page
  3. Boris Bellesia
    19/03/2009, 09:25
    •Organisation of hardware commissioning, meetings, … •What happens before powering tests after cooldown •Commissioning of Warm sectors, Cold sectors and sector 34: what needs to be done? What can be dropped? •When should we work: 2 shifts during 5 days versus 3 shifts during 7 days, MPP analysis, what can be done in a nightshift – WE? Bottlenecks in manpower •Rules for patrols during powering tests
    Go to contribution page
Building timetable...