ILC LET workshop

from Wednesday 8 February 2006 (09:00) to Saturday 11 February 2006 (14:00)
CERN

        : Sessions
    /     : Talks
        : Breaks
8 Feb 2006
9 Feb 2006
10 Feb 2006
11 Feb 2006
AM
09:00
Lattice Design (until 10:30) ()
09:00 D. Schulte: Introduction   ()
Slides
10:30 --- coffee break ---
10:50
Main Linac Studies 1 (until 12:30) ()
10:50 P. Lebrun: LET studies at Fermilab   ()
Slides
11:20 F. Poirier: Dispersion Free Steering for the ILC using Merlin   ()
Slides
11:40 A. Latina: Steering the main linac with different bunch compressor settings   ()
12:00 J. Smith: Benchmarking of dispersion free steering   ()
Slides
09:00
Beam Delivery System Alignment (until 10:30) ()
09:00 G. White: Alignment, tuning and feedback in the BDS   ()
Slides
09:20 P. Eliasson: Update on beam-beam tuning   ()
Slides
10:30 --- coffee break ---
10:50
Ring to Main Linac Alignment and Tuning (until 12:30) ()
10:50 P. Tenenbaum: RTML status and studies   ()
Slides
09:00
Polarization Issues (until 10:30) ()
09:00 J. Smith: Polarisation studies with BMAD   ()
Slides
09:20 I. Bailey: Spin tracking studies by the heLiCal collaboration   ()
Slides
09:40 P. Schmid: Spin rotator work   ()
Slides
10:30 --- coffee break ---
10:50
Polarization 2 (until 12:30) ()
09:00
Summary (until 10:30) ()
09:00 P. Tenenbaum: Summary   ()
Material
10:30 --- coffee break ---
10:50
Summary 2 (until 12:30) ()
PM
12:30 --- lunch break ---
13:30
Main Linac Studies 2 (until 15:30) ()
13:30 P. Eliasson: An update on main linac tuning bumps   ()
Slides
13:50 D. Schulte: Some Remarks on Disperison Free Steering and Beam Jitter   ()
Slides
14:10 K. Kubo: Beam Based Alignment Simulations   ()
Slides
14:20 K. Kubo: Curved linac studies update   ()
Slides
14:30 D. Schulte: Simulations of a curved tunnel   ()
Slides
14:50 R. Jones: Longrange Wakefields and their Effect in the Main Linac   ()
15:30 --- coffee break ---
15:50
Main Linac Studies 3 (until 18:00) ()
12:30 --- lunch break ---
13:30
RDR Preparation 1 (until 15:30) ()
13:30 Answers to Main Linac Area Systems request for comments   ()
Paper
15:30 --- coffee break ---
15:50
RDR Preparation 2 (until 18:00) ()
12:30 --- lunch break ---
13:30
Instrumentation Requirements 1 (until 15:30) ()
13:30 M. Ross: Instrumentation   ()
Slides
15:30 --- coffee break ---
15:50
Instrumentationm Requirements 2 (until 18:00) ()