Choose timezone
Your profile timezone:
N˚
|
Powering Procedure Title
|
EDMS n. / STATUS
|
Editors
|
Equipment experts
|
|
Test procedure and acceptance criteria for the 13 kA dipole circuits
|
874713
Released
|
A.Verwej
M.Pojer
M.Solfaroli
|
V.Montabonnet / H.Thiesen
M.Zerlauth
K.Dahlerup-Petersen / R.Denz
A.Ballarino
|
|
|
2
|
Test procedure and acceptance criteria for the 13 kA quadrupole (RQD-RQF) circuits
|
874714
Released
|
A.Verwej
M.Pojer
M.Solfaroli
|
V.Montabonnet
M.Zerlauth
K.Dahlerup-Petersen / R.Denz
A.Ballarino
|
|
3
|
Test procedure and acceptance criteria for the 600 A circuits
|
874716
Released
|
W.Venturini Delsolaro
B.Bellesia
M.Pojer
|
V.Montabonnet
M.Zerlauth
R.Denz
G.J.Coelingh
A.Ballarino
|
|
4
|
Test procedure and acceptance criteria for the 80 A and 120 A dipole corrector circuits
|
874722
Released
|
G.D’Angelo
A.Vergara
M.Solfaroli
|
D.Nisbet
M.Zerlauth
A.Ballarino
|
|
5
|
Test procedure and acceptance criteria for the 60 A corrector circuits
|
874724
Released
|
G.D’Angelo
A. Vergara
M. Solfaroli
|
D.Nisbet
M.Zerlauth
A.Ballarino
|
|
6
|
Test procedure for the individually powered 4-6 kA Quadrupole-circuits in the LHC insertion
|
874884
Approval Closed
|
N.Catalan Lasheras
G.Kirby
A.Vergara
B.Bellesia
|
D.Nisbet
M.Zerlauth
R.Denz / S. le Naour
A.Ballarino
|
|
7
|
Test procedure and acceptance criteria for the separation dipoles circuits
|
874885
Approval Closed
|
G.Kirby
N.Catalan Lasheras
A.Vergara
B.Bellesia
|
D.Nisbet
M.Zerlauth
R.Denz / S. Feher
A.Ballarino
|
|
8
|
Test procedure and acceptance criteria for the Inner Triplet circuits
|
874886
Eng. Check Closed
|
N.Catalan Lasheras
G.Kirby
A.Vergara
M.Pojer
|
H.Thiesen / J.Thomsen
M.Zerlauth
R.Denz / S. Feher
A.Ballarino
|
|
9
|
Test procedure and acceptance criteria for the Powering of Group of Circuits
|
916266
Eng. Check Closed
|
G.Arduini
R.Wolf
B.Bellesia
M.Solfaroli
|
V.Montabonnet / H.Thiesen
M.Zerlauth
K.Dahlerup-Petersen
R.Denz
G.J.Coelingh
A.Ballarino
|
Reported by W. Venturini Delsolaro