GIF++ installation and schedule meeting

→ Europe/Zurich
864/1-C02 - indisponible a partir du 24/04/2017 (CERN)

864/1-C02 - indisponible a partir du 24/04/2017

CERN

50
Show room on map
Roberto Guida (CERN)
    • 09:00 → 09:20
      Summary/feedback from last test beam 20m
      Speakers: Barbara Alvarez Gonzalez (CERN), Giulio Aielli (Universita e INFN Roma Tor Vergata (IT)), Katerina Kuznetsova (Petersburg Nuclear Physics Institut (RU)), Nicolas Zaganidis (Ghent University (BE))

      1-2 slides per setups which used beam

       

      slides from setups which did not use beam are welcome

       

       

       

    • 09:20 → 09:40
      Current test beam 20m

      -1st week
      -2nd week

      1st week:

      *upstream

      CMS-RPC (taking data)

      ATL-MDT (taking data)

      *downstream

      CMS-CSC (not taking data with beam)

      ATL-RPC (taking data, may not need full week but need CSC to move on side--> Katerina will call Giulio today for the movement)

       

      2nd week:

      CMS-DT main user

      *upstream

      CMS-RPC (taking data)

      ATL-MDT (taking data)

      *downstream

      CMS-DT (taking data)

    • 09:40 → 10:00
      Plan for next wednesday (MD) / thursday (source scan) 20m

      Small issues for CMS-DT installation to follow:

      -ATL-RPC need to be moved by few cm in the direction of the source

      -ATL-TGC find alternatives to present bridge which cross the rail

       

      ATL-CSC started the test.

      Test will continue for 1 (2) week 

       

      wed 7/9

      ATL-MM need false floor to be open.

      CMS-DT installation

       

      CMS-CSC vs ATL-RPC vs ATL-TGC vs ATL-MM

      CMS-CSC will move out for a couple of days not to be in front of RPC.

      Downstream area setups:

      -1st : discussion about position and size (9 am)

      -2nd : beginning next week

      -3rd : onsite next Wednesday 

      -4th: discussion involving everybody 

      CMS-DT and Roberto will check next Wednesday (9am) if it is possible to remove temporarily the rail after the CMS-DT beam period (leaving the rail in the bunker if it is not a problem for other users)  

       

      Thu 8/9

      plan according to test beam.

      CMS-DT main user

    • 10:00 → 10:20
      Plan for 2017 20m

      please provide info about:
      -new requests
      -plan for setups currently under test

    • 10:20 → 10:35
      New request for testing optical fibre 15m

      introduction, goal of the test, plan, needs

      Speaker: Ezio Torassa (Universita e INFN, Padova (IT))
    • 10:35 → 10:55
      Preparation of next test beam periods 20m

      updated version of setups position and schedule for next test beam.

      Speaker: Roberto Guida (CERN)
    • 10:55 → 11:15
      Irradiator duty cycle (source on wrt source off time) 20m
      Speaker: Antonio Bianchi (Universita e INFN Torino (IT))

      PAXN1646 = upstream

      PAXN1647 = downstream

    • 11:15 → 11:20
      Run coordinator 5m
      Speaker: Antonio Bianchi (Universita e INFN Torino (IT))