AWAKE spectrometer meeting
Minutes of AWAKE spectrometer meeting - 21/10/2016
Present:
Bart, Stefano (CERN)
Lawrence, Matthew, Michele, Simon (UCL)
Simulation of the optical line - Stefano
-> Has received comments to optical simulations and will re-do some simulations based on these. Update results by end of next week.
- It seems that a flatter (than 5*lambda) mirror will be needed and it will then be a trade-off of flatness and cost.
- Qualitative answer with new simulations.
- Calibration light. Issues / options:
- Option of moveable light and target which can track across the screen.
- Option of fixed LEDs on vacuum chamber.
- One light source with diffuser to give vertical extension.
- Fixed light source which is switched on and off.
- Frequency of calibration ?
- Different options can lead to different information; wWhat do we want the calibration light to do ?
- Distortion / focusing from optical system, check e.g. once a day.
- Absolute position of screen.
- Uniformity of optical system and something to give independent measures of screen & mirrors, camera.
- Additional source of calibration is electron beam but how often can the injected beam be used, i.e. ramping magnet down ?
-> Will continue to think and discuss this.
For optical field of view:
- The height should be from upper bolt centre to lower bolt centre. What is this value
- Is the length 1 m ? Have some tolerance, e.g. +- 1 cm
-> Double check dimensions with Jan / Nicolas
Mirrors - Bart / Stefano
- Mirror coating / protection
-> Look at doing tests with coating and protection as well as simulations.
- HiRADMAT have unprotected mirrors.
-> Thomas can make two mirrors, protected and unprotected and we can test.
- Coat as appropriate later on; can be done by CERN.
- A possibility is to order mirrors with no coating/protection asap and do what is needed later.
-> Ask for quotes for different options
Infrastructure - Bart / All
- See slides
- Rack has arrived
-> Ethernet cabling could be done and the purchase order is awaiting approval - since approved, but missed the deadline for cabling this time and so will be done in the next cabling campaign.
-> Optical table to be ordered soon - order since gone out.
AoB
- Michele asked about OASIS and in particular who to contact for e.g. costs, etc. and is there an OASIS node near the spectrometer rack.
-> Bart / Stefano can ask controls who Michele should talk to.
Next meeting 7. 11. 11AM CERN time (10AM UCL time)