Minutes of AWAKE spectrometer meeting - 21/10/2016

Present:
Bart, Stefano (CERN)
Lawrence, Matthew, Michele, Simon (UCL)


Simulation of the optical line - Stefano

-> Has received comments to optical simulations and will re-do some simulations based on these.  Update results by end of next week.
    - It seems that a flatter (than 5*lambda)  mirror will be needed and it will then be a trade-off of flatness and cost.
      - Qualitative answer with new simulations.
- Calibration light.  Issues / options:
  - Option of moveable light and target which can track across the screen.
  - Option of fixed LEDs on vacuum chamber.
  - One light source with diffuser to give vertical extension.
  - Fixed light source which is switched on and off.
  - Frequency of calibration ?
  - Different options can lead to different information; wWhat do we want the calibration light to do ?
    - Distortion / focusing from optical system, check e.g. once a day.
    - Absolute position of screen.
    - Uniformity of optical system and something to give independent measures of screen & mirrors, camera.
  - Additional source of calibration is electron beam but how often can the injected beam be used, i.e. ramping magnet down ?
  -> Will continue to think and discuss this.

For optical field of view:
  - The height should be from upper bolt centre to lower bolt centre.  What is this value
  - Is the length 1 m ?  Have some tolerance, e.g. +- 1 cm
  -> Double check dimensions with Jan / Nicolas

Mirrors - Bart / Stefano

- Mirror coating / protection
  -> Look at doing tests with coating and protection as well as simulations.
    - HiRADMAT have unprotected mirrors.
    -> Thomas can make two mirrors, protected and unprotected and we can test.
  - Coat as appropriate later on; can be done by CERN.
    - A possibility is to order mirrors with no coating/protection asap and do what is needed later.
  -> Ask for quotes for different options

Infrastructure - Bart / All

- See slides
  - Rack has arrived
  -> Ethernet cabling could be done and the purchase order is awaiting approval - since approved, but missed the deadline for cabling this time and so will be done in the next cabling campaign.
  -> Optical table to be ordered soon - order since gone out.

AoB

- Michele asked about OASIS and in particular who to contact for e.g. costs, etc. and is there an OASIS node near the spectrometer rack.
  -> Bart / Stefano can ask controls who Michele should talk to.

 

Next meeting 7. 11. 11AM CERN time (10AM UCL time)