Decisions:
1. Commit the fixes for bugs #50301, #50274, #49055 and the patch for the new RAW format.
2. Start the EMCAL production without B-jets. Check the production macros.
3. One of the TPC IROC has gains equal to zero in the production LHC09a4. We have to cut the corresponding sector in the analysis.
4. PT shift is probably caused by the Bx and By components of the magnetic field, that are not taken into account in the propagation. Test with Bx,By=0.
5. The snapshots of the track parameters ITSout, TPCout and TRDin are needed for debugging of the tracking and for correct matching. This information should be stored for a fraction of the events. We start with the implementation where it is stored in the ESD friends.
There are minutes attached to this event.
Show them.