Minutes of AWAKE spectrometer meeting - 15/Dec/2016

Present: Fearghus, Lawrence, Matthew, Michele, Simon, Stefano


Stefano

- See slides
  - Presented first ideas on support designs.
  - Presented first ideas on mount designs.
    - ESO people recommended to minimise metallic support area glued to glass.  The design was therefore adapted according to this.
    -> Need additional support (to the three on the back) from the side due to an angle of the mirror to the floor.

  - Mirror sample tests. 
    - Stefano will collect the mirrors next week.
    -> Thomas Schneider to analyse them in mid-January.

  - Ordering mirrors: order uncoated and then coat, protected or unprotected, as needed. 
  - The coating can then be done in CERN at a lower costs.     
  -> All agreed with this and so the orders can be placed.
  - Quotes from three companies are in.  For 3 big (~9k each) + 2 small (~6k each) total is ~ 40 kEUR.
  - The three quotes will be given to CERN purchasing and they will go with the cheapest.
 -> Decide to order 4 big + 2 small mirrors, i.e. ~ 50 kEUR.

 - Optical table arrived in CERN.  Since decided that it will be transported to final position and kept packed.

 -> Note that came up in discussion: due to mirror positions, the screen image is not completely horizontal at camera, so will tilt camera to have horizontal.
 

Lawrence

- Scintillator screen
  - The company is waiting on delivery of phosphor.
    -> To phone up and ask about why process went wrong.
  - Can CERN cut the screen to the right dimensions ?
    -> Stefano to ask and Fearghus to find data sheet so can check any safety concerns.
  - Another company (DMZ) makes these screens.
    -> Lawrence to ask for a quote.

- Filter
  - Holder is a strange size.
  -> Stefano can order mount; Lawrence to pass on details.  Semrock has many options.

- Water cooler: still waiting for quote.


Michele

- In discussion with Stefano on UPS.


Simon

- Light-tight enclosure.
  -> Fearghus still needs CAD drawings.
  -> Stefano to follow up switching off / on lights and light-tight path from mirror 3 to camera with Bart.
  - People in the workshop are thinking about blinkers / covers.
  -> Need more discussions about what to do in the linking tunnel.


Next meeting: Tuesday 17 January at 11:00 / 12:00 (UK / CERN time).