AWAKE spectrometer meeting
Minutes of AWAKE spectrometer meeting - 15/Dec/2016
Present: Fearghus, Lawrence, Matthew, Michele, Simon, Stefano
Stefano
- See slides
- Presented first ideas on support designs.
- Presented first ideas on mount designs.
- ESO people recommended to minimise metallic support area glued to glass. The design was therefore adapted according to this.
-> Need additional support (to the three on the back) from the side due to an angle of the mirror to the floor.
- Mirror sample tests.
- Stefano will collect the mirrors next week.
-> Thomas Schneider to analyse them in mid-January.
- Ordering mirrors: order uncoated and then coat, protected or unprotected, as needed.
- The coating can then be done in CERN at a lower costs.
-> All agreed with this and so the orders can be placed.
- Quotes from three companies are in. For 3 big (~9k each) + 2 small (~6k each) total is ~ 40 kEUR.
- The three quotes will be given to CERN purchasing and they will go with the cheapest.
-> Decide to order 4 big + 2 small mirrors, i.e. ~ 50 kEUR.
- Optical table arrived in CERN. Since decided that it will be transported to final position and kept packed.
-> Note that came up in discussion: due to mirror positions, the screen image is not completely horizontal at camera, so will tilt camera to have horizontal.
Lawrence
- Scintillator screen
- The company is waiting on delivery of phosphor.
-> To phone up and ask about why process went wrong.
- Can CERN cut the screen to the right dimensions ?
-> Stefano to ask and Fearghus to find data sheet so can check any safety concerns.
- Another company (DMZ) makes these screens.
-> Lawrence to ask for a quote.
- Filter
- Holder is a strange size.
-> Stefano can order mount; Lawrence to pass on details. Semrock has many options.
- Water cooler: still waiting for quote.
Michele
- In discussion with Stefano on UPS.
Simon
- Light-tight enclosure.
-> Fearghus still needs CAD drawings.
-> Stefano to follow up switching off / on lights and light-tight path from mirror 3 to camera with Bart.
- People in the workshop are thinking about blinkers / covers.
-> Need more discussions about what to do in the linking tunnel.
Next meeting: Tuesday 17 January at 11:00 / 12:00 (UK / CERN time).