AWAKE spectrometer meeting
CERN
Present: Fearghus, Ishkhan, Lawrence, Matthew, Michele, Simon, Stefano
Welcome to Ishkhan who has joined the CERN-BI group and will work on the spectrometer.
Stefano
- Can switch off lights in hall and no safety lights around that area.
-> Will need to have some enclosure in the camera / mirror 3 area.
- Received filter specs from Lawrence today and can then order once has measurements of size.
- Manufacturer wants to increase mirror thickness to 40 mm. Price stays same, so we are okay with this.
-> Ishkhan to find out about vibration in the hall.
Michele
- Software tests at the beginning of March.
-> Need 'scope with 500 MHz; ask Stefano if they have a spare and if not get it from CERN pool.
-> Meet with Lars afternoon on 2/Mar.
- E-mail from Simon on triggering camera ? Fearghus said that Bart said that Lars should have ordered a trigger cable.
-> Fearghus / Michele to discuss issue with Lars.
Lawrence
- Scintillator screen.
- Different phosphor gives 25% light yield of previous versions. So we can test and try it.
- Also looking at DRZ screens from MCI Optonix screens which should give a high light output.
- BDSIM is now working after the upgrade and so can get back to work on it.
Fearghus
- Asked for quote for DRZ screen
- Asked for quote for cooling system from ANDOR company and US manufacturer ($2600)
-> Workpackage description done from his side. Passed on to Michele as DAQ is out of date.
Matthew
To discuss talks at Collaboration Meeting with Edda. Could have:
- Overall spectrometer status - Fearghus
- Performance and backgrounds - Lawrence
- Camera acquisition - Michele
but may need to compress if not enough time.
Many of us will meet at the Collaboration Meeting in Novosibirsk in 2 weeks.