PhaseII discussion

→ Europe/Zurich

1) ITK Power supply : Ming-Lee
   - ATLAS wants the input voltage source and the output voltage source to
     have separate grounding
     - such commerical PS will be expensive, and only few channels per PS.

   - Due to requireing of different groundings, it is not easy to have very precise
     control of the output voltage. Most commerical product can get the precision to ~2%.
     Ming-Lee aims to get to ~1-2% precision.

   - Ming-Lee has some idea how to build such multi-channel PS 
     - plan to start buying component parts and put together a single channel prototype.
     - Try to have a prototype in late April or early May
       - We should have the next discussion then
     - We should also give a presentation at the ITK PhaseII electronics meeting first
       before we report at the ITK week in June (starting on June 26).


2) HGTD
   - sensors
     - Chih-Hsun mentioned CMS is also planning to have a timing detector and
       both ATLAS and CMS may use the same sensor technology (LGAP)
       - NCU and NTU groups may join in the sensor development
       - maybe a good idea that Taiwan (AS+NCU+NTU) join together in the sensor development
         for ATLAS and CMS

     - Chih-hsun sent an email to Suen about this idea.

   - optical link :
     - Suen is collaborating with SMU about this. Not sure how both groups
       will collaborate and what is the plan.

   - simulation studies of pile up background
     - Song-Ming has started on this, writing code to differentiate jets from
       hard interactions and from pileup. There are samples produced with upto
       pileup of 200 interactions per bunch crossing.