SPS Injection Interlocking - Third meeting

→ Europe/Zurich
774/1-079 (CERN)

774/1-079

CERN

20
Show room on map
    • 1
      Comments on the minutes and actions of the previous meeting
      • Why is there in the LHC a direct link between LBDS and Injection BIS (Bruno)
      • Revisit of injection BIS inputs and outputs. Dumping the beam on the injection dump with Q20 optics (Verena) and how to interlock
    • 2
      Possible connection of timing CBCM health check to the BIS
      Speaker: Jean-Claude Bau (CERN)
    • 3
      Which systems will need to interlock on receiving the 1 kHz clock (All)