CLIC Implementation Meeting: Main Linac Hardware Baselining
Wednesday 26 Apr 2017, 09:00
→
11:00
Europe/Zurich
6/2-004 (CERN)
6/2-004
CERN
40
Show room on map
Carlo Rossi
(
CERN
)
09:00
→
09:10
Approval of minutes of MLHW meeting #6
10m
Speaker
:
Carlo Rossi
(
CERN
)
MLHW_Baselining_meeting06Draft.docx
MLHW_Baselining_meeting06Draft.pdf
09:10
→
09:20
A klystron-based module and implications for its development and integration in the machine layout.
10m
Speaker
:
Carlo Rossi
(
CERN
)
CLIC_K-Module_260417.pdf
CLIC_K-Module_260417.pptx
09:30
→
09:50
Study of the drive beam misalignment.
20m
Speaker
:
Xiangcong Meng
(
Tsinghua University (CN)
)
drive beam misalignment_20170426.pdf
drive beam misalignment_20170426.pptx
09:50
→
10:00
Layout and alignment options for the CLIC DB Module.
10m
Speaker
:
Alex Vamvakas
(
CERN
)
Layout 26.04.17.pdf
Layout 26.04.17.pptx
10:10
→
10:30
First Analysis of CLIC Module lifecycle for the DB case.
20m
Speaker
:
Alex Vamvakas
(
CERN
)
Lifecycle analysis 26.4.17.pdf
Lifecycle analysis 26.4.17.pptx
10:40
→
10:50
CLIC 380 GeV vs. 3 TeV magnet power saving.
10m
Speaker
:
Michele Modena
(
CERN
)
CLIC 380 GeV presentation 26-4-17.pdf