Present: PiPPo, Tuan, Erno, Tivadar, mazsi
Secretary: Erno(21), PiPPo(9), Shuaib(1), mazsi(31)
Report on Actions:
N/A
Actions:
N/A
1. 10G PON
N/A
2. GBT
N/A
3. DCS
N/A
4. PCIe
N/A
5. Integration
N/A
6. Production
N/A
7. Simulation
N/A
AOB
- release: delay with 2 weeks, schedule for 15/10/2017. will be based on quartus 17.0 standard (i.e. .qsys based IP cores), but should compile with Q17 Pro, too; will switch to Pro with the next release. main focus is to improve tests + documentation.
- one CRU card might need to go to heidelberg, if fixing the broken power supply on their card takes a long time. CRU in cru-server2 is the candidate.
- poster and talk on TWEPP 2017 was well received. also talk in BNL (questions were mostly about removing the PLX PCIe bridge for V2. they will probably go with the FELIX card).
- catch-up discussions
Travels/Vacations