* AWAKE spectrometer meeting

→ Europe/Zurich

Present: Fearghus, Ishkhan, James, Matthew, Michele, Stefano

 

- UCL's new PhD student, James Chappell, was welcomed to the group.  He will be working on:

  o Measurement of emittance via a quad scan from AWAKE data from next year.

  o Design of accelerated electron bunch beam diagnostics, i.e. energy + emittance, for AWAKE Run 2, also given experience of next year's measurement.

  o Design considerations of electron beam @ 50 GeV for an ep collider when using AWAKE scheme to accelerate electrons.

 

Fearghus / Ishkhan / Stefano

- Installation of supports:

  o Supports were received last week and sent to metrology.

  o Geometers aligning today.

  o Supports offset by ~ 40 mm compared to design due to holes in wrong place.  Hopefully, okay, but we'll see.

  o Fix final bars to floor and wall once alignment done.

  o Once mounts are done, dark room and holes in wall/door will happen.

    -> Marked hole in dark room to feed cables.

    -> Marked hole for light path into dark room

    -> Marked hole in fire wall.

    -> Marked hole in yellow gate/door.  Vertical extent known, but not horizontal extent.

- Calibration lamp holder being installed.

  o Laser will initially be used for alignment.

- Phillippe measuring spectrometer distances too.

- To install camera/lens

- Mirror alignment next week.

- Fire-door window shipped and should arrive next week.

 

Michele

- Started discussion with Davide and Spencer on linking camera to 10 Hz trigger.

  - Does not look doable.

  - So use SPS trigger.

  - For calibration, need to use s/w trigger; we need to be careful when calibrating.

- Veto circuit - can be done in 20 min by Electrical Engineer.

 

Matthew will catch up on status when next in CERN, 16-18/October.