Phase 2 Beam Pipe Progress Monitoring

→ Europe/Zurich
40/R-B10 (CERN)

40/R-B10

CERN

20
Show room on map
    • 09:00 → 09:10
      Introduction 10m
      Speaker: Wolfram Zeuner (CERN)
    • 09:10 → 09:40
      Status of new beam pipe 30m

      Status of the phase 2 beam pipe after the EDR, covering both
      the preparation of the production of the Be-pipe and the Al-pipes

      Speaker: Josef Sestak (CERN)
    • 09:40 → 10:00
      Plans for the new supports at 3.2m for phase 2 20m

      Ideas for new supports at the transition between central and endcap pipe

      Speaker: Robert Loos (CERN)
    • 10:00 → 10:30
      Discussion 30m

      Discussion
      a) Do we need additional radiation/activation simulations
      b) How to prevent condensation outside the tracker volume
      Next steps and actions
      c) Next meeting, dates, time and frequency of coming meetings

      Speaker: All