ETICS Technical Commitee

→ Europe/Zurich
TBD (CERN)

TBD

CERN

A.Aimar
Description
Conference Name: ETICS Technical Committee meeting Recurrence: Every Thursday at 15:30 CET Dial-in numbers: +41227676000 (Main) Access code: 0126137 (Participant) Participant site: https://audioconf.cern.ch/call/0126137
    • 15:30 → 15:35
      Welcome and headcount 5m
    • 15:35 → 16:00
      Status reports 25m
      Highlights of the week, 5 minutes for each WP (NA2, SA1, SA2, JRA1, JRA2)
      • NA2 5m
        NA2 weekly report 11th – 17th September - Prepared the new version of the brochure. It was reviewed by PMB and it’s being printed. - Organising the session on Standards and Certifications for EGEE09 - Contacted ServiceWave conference organizers to see if there are any dissemination opportunities available (a proposal for a workshop had been presented a few months ago but it was rejected). We re-sent the workshop proposal and it will be re-examined to be possibly added in an empty slot. - Updated the website with a new feature list and new events - Preparing the slides for QA&TEST (deadline tomorrow). Deliverables - DNA2.8 Dissemination and Use of Knowledge Plan (Third Update) sent to PMB and TC for review - DNA2.6 resubmission (long-term sustainability strategy) sent to PMB and TC for review
      • SA1 5m
        ++ Services - SA1 Services ran smoothly even if there were many absences - Working on the features agreed in Budapest plus the usual activities - Preparation of workshops/conferences/absences and holidays had a major impact or how much development can be done. ++ Releases - One release of the Services (2.4.4): 1 hour intervention - Two releases of the Client (1.4.8 and 9): 0 hours intervention. - All Release descriptions are available here: https://twiki.cern.ch/twiki/bin/view/ETICS/SA1ReleasesContents ++ Development - Working on multi-node testing on all aspects involved (WS, repository, clients, etc) - Adapting the Web Applications to support the configuration and launch of multi-node tests. - Plugins are included and executed. Collecting metrics - Dashboard for a User Project is being defined and will be included in the next major release - VMloader (ex bootstraper) can execute and report the resutls on vmware. Working in integrating it with NMI. Dynamically runs builds and tests on a worker node with VMWARE and the images of SL4,5 on 32,64 bits. As a proof of concept and prototype is a success. - AQCM report is considering many metrics. Only a few missing. Reports shoudl be generated soon. - Privacy: Disable anonymous access (guest = no access) will be in two weeks - Plug-ins integration is completed. Very good job from Jozsef, after the first iterations most of plugins were very good - Submitters integration progressing on the development environment (SA2). ++ Deliverables - Working with JRA1 on DJRA1.5 (implementation of VM support) - Reviewing DNA1.6, DNA2.8, DJRA1.4
      • SA2 5m
        +++ Support - MicheleDB, Uwe, Claudio in shift. Pretty quiet weeks. +++ Requirements - Uwe will test that the work on authz filtering done by SA1 works for them. +++ New Applications - Uwe got a few problems with the services at VEGA, related to Metronome requirring open ports and their firewall policies. Trying to workaround moving metronome. Installing the services still a bit of a pain. Uwe reported automated installation is smooth, but later tricky stuff appears. Metronone and its requirements seems to be a problem. Shall we consider a simple submitter that sit in front of a set of static machines and dispatch jobs. Though it would be weak in heavy load situations, for simple setup it might work. Would that break multinode mechanisms? +++ Infrastructure Integration Job Submission - Started working on moving to using the gLite API instead of the command line. Example code submitting to the WMProxy, getting the status from the L&B, and cancelling at the WMProxy working. We have used the WMProxy JAVA API as distributed by gLite. We instead went to use the L&B WSDL as the Java API loaded a bunch of C code. Now we are evaluating whether to use directly the WMProxy WSDL as well. - UNICORE submitter prototype working. Andre' will move the code to ETICS CVS. The configuration will be attached to etics-dev as soon as the packaging is ready. What about testing it? Are we willing to install UCNIORE what's needed or shall I ask Andre' to provide a deployment that can be accessed from CERN? - EC2 submitter development slowly going on. I've started to put some design on the wiki page. Will circulate it for discussion (i know I've said it before but that isn't high priority at the moment). Eng asked to collaborate in the activity, they got a student for that. I will talk to AndreaT next week to see how this can be done. EC2 accounts? +++ Deliverables and Milestones - DSA2.5 PM15 Completed . What shall we do with the testing guidelines for DSA2.5? Do we have news so to consider delivering an addendum as agreed at DSA2.5 delivery? - DSA2.6 PM20 Not started yet. - MSA2.4 PM20 ETICS working with user defined services.
      • JRA1 5m
      • JRA2 5m
        Implementation Testsystem portlet is now integrated into the etics-dev. It seems to be correct. Deploying TestSystem web services into etics-dev - creating appropriate build, config files and etics configs have been done. Connecting TestSystem Portlet with the TS web services - unsing the etics deployment scripts - is also has been done. ETICS authentication mechanism - ssl connection – has been done. One of the web services produces some errors. Jozsef asked for some temporary rights to investigate and to solve the problem on etics-dev. Selenium test have been designed for the GUI and the scenario is under work. Plugin development Andras uploaded Vera++ and Cppcheck plugins into the CVS. DesktopGrid scenario in Sztaki They continued to work on the desktopgrid scenario BOINC, DC-API, uppercase are the connected applications. They managed to resolve most of the problems that they had with debian. They also have some problems with svn which are now under work and hopefully we can go further. Delverables, reports DJRA2.5 has been sent for internal review – waiting for comments. JRA2 quaterly report has been sent.
    • 16:00 → 16:05
      User satisfaction survey, AOBs 5m
      First version of the online survey at: http://etics.web.cern.ch/etics/survey.htm
    • 16:05 → 16:20
      Deliverables, milestones and planning check 15m
      Formal check of agreed milestones and planning
      Deliverables
    • 16:20 → 16:25
      ETICS USIS (User Satisfaction Improvement Strategy) 5m
      Improving user satisfaction about usage of the ETICS services is critical. ETICS is often perceived as slow and difficult to use. This is due to a number of factors: 1) Need for technical improvements in speed and usability 2) Disinformation or third-party rumours 3) General resistance to adopt 'procedures' We need to understand what to focus on and have a plan to address this issue as a combination of technical enhancements, training and dissemination. Where to start?
    • 16:25 → 16:30
      AOB 5m