Summary of discussion between EN-EA and BE-OP
Speakers:
Dr
Johannes Bernhard
(CERN), Dr
Lau Gatignon
(CERN), Dr
Nikolaos Charitonidis
(CERN)
- BE-OP-SPS suggested then to keep the FT as last year (4.8 s) and run at 3.5e13 ppp (max instantaneous rate)
- Also, we suggested to increase the duty cycle reducing the MD cycle that will be in the production super cycle
- Passing from 6 BP to 3 BP => to be confirmed the technical feasibility but no major problems foreseen
- Action OP-SPS: check if any technical problem before undertake this option
- This would comport an increase of about 10% in average POT/day
- No need to discuss with LHC as no impact on filling SC
- Lau and Johannes agreed on validity of the new proposal and will discuss this with the experiments
- Action LG and JB: report the experiments opinion on the options presented