PASTE meeting

→ Europe/Zurich
2-R-014 (CERN)

2-R-014

CERN

Andrei Tsaregorodtsev
Description
CERN, bat 2 R-014 To join the telephone conference, click here: https://audioconf.cern.ch/call/0165202 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0165202
Production and PASTE Meeting, 13th October 2009, CERN Chair: A.Tsaregorodtsev Minutes: S.Paterson CERN: J.Closier, Z.Mathe, S.Paterson, M.Rashid, R.Santinelli, A.C.Smith, F.Stagni Phone: V.Fernandez, R.Graciani, R.Nandakumar, M.Sapunov, A.Tsaregorodtsev Apologies: P.Charpentier, V.Romanovsky 0. Ongoing Action List SVN #11124 Joel commented that the scripts for migration have to be discussed after the new structure. The Savannah action will be updated after the issues are understood. CREAM CE #11223 Roberto mentioned it was possible to query the CE for availability of the queues but this is not available by default. Andrei suggested requesting this CE monitoring plugin at the GDB level. There was some discussion regarding the treatment of output sandboxes. The CREAM CE should accept a SURL as destination for the output sandbox, however, currently this cannot talk to SRM. Resurrecting the classic SE would be another solution, as would storing the logs on the local file system. All these solutions will be conveyed to the developers. 1. Production Status Report - Report from the Production meeting Available disk space at the Tier-1 sites is becoming a concern, how to proceed with simulation productions? Should be discussed at PPG in case old data can be cleaned up (perhaps cleaning some copies of DC06 DSTs). All the sites should also be solicited to provide more disk space. ( ACTION: Philippe ) The first two 'Upgrade' productions have completed successfully, nice to demonstrate productions with different configuration versions are handled correctly. Stripping has been ongoing, attempted 5 and 10 input data files with both productions only achieving 40% of data processed after the first full pass. The vast majority of failures are due to data access at the dCache Tier-1s (with the exception of PIC). FEST reconstruction (full and express) has been ongoing in the past week, several iterations to fix AppConfig options but this is now running smoothly. FEST stripping is almost in place (testing starting from RAW) just have to confirm the last DaVinci step options. 2. GDB Report See slides attached to agenda. Roberto is willing to accept comments via mail until the end of today. 3. DIRAC Release Update Andrei mentioned that the JobDB has 1M jobs, an effort will be made to clean these up. 4. Hardware Configuration See Ricardo's report attached to agenda. Scalability tests have been running for over a month on volhcb14 (8 disks). Splitting the databases onto different disks we can gain an order of magnitude in query rate. Only at 10k Hz did we start to hit the MySQL limit. We can guarantee that the capacity of the system will be enough to run the production system for the foreseeable future. A meeting with the IT people should be organized for the next DIRAC week starting 2nd November. ( ACTION: Joel ) 5. DIRAC Tasks - Infrastructure monitoring (SAM,SLS,Dashboard) A Nagios box is being set up, we can start to migrate our tests. Space token monitoring informations will start to be aggregated after the GDB. Some lemon alarm sensors will be added for our VO-boxes to allow 24/7 coverage. - Bookkeeping status BK web page was moved to production, a bug fix was made to fix a problem with saving python options files. - WMS status The DIRAC site was tested with Florian with 20k jobs running successfully. At some point the monitoring threads caused some problems in the development system. A default timeout was added for all RPCClients. - DMS status The online file monitoring page was added to the web portal. Work started on analysing the storage dumps provided by some T1 sites. - Documentation Ongoing, a new twiki page is being prepared. 6. AOB Next DIRAC week starting at 2nd November. The major issues to discuss there will be code restructuring and the final hardware configuration of the production system.
There are minutes attached to this event. Show them.
    • 09:30 → 10:00
      Ongoing actions 30m
      The task list is available via the Savannah DIRAC group ( Task List ). If you are not already registered please do so at the Savannah page. In order to streamline the time spent during PASTE on the actions list only tasks in the status 'ToBeDiscussed' will be discussed there. In case some actions fall by the wayside they will automatically be updated to this status. Therefore the action assignees should take care to update this. For ongoing actions it is advantageous to report any progress in the Savannah tasks each week.
    • 10:00 → 10:30
      Production issues 30m
      - Report from the Production meeting
    • 10:30 → 10:50
      GDB report 20m
      Speaker: Roberto Santinelli
      Slides
    • 10:50 → 11:10
      DIRAC Release Update 20m
      - v4r19p3-8 releases
    • 11:10 → 11:30
      Hardware configuration 20m
      Speaker: Ricardo Graciani
      document
    • 11:30 → 12:00
      DIRAC tasks 30m
      - Infrastructure monitoring (SAM,SLS,Dashboard) - Framework status - Bookkeeping status - WMS status - DMS status - Production Management status o production job post-execution checks - VO-boxes - Web Portal - Services deployment ( hardware, configuration ) - Documentation
    • 12:00 → 12:10
      AOB 10m
      Next DIRAC week starting at 2nd November