Speaker
Serge Deleval
Description
The presentation, after a brief summary of the 2009 run from the CV point of view, will focus on several major improvements and concerns. Such as the optimization of the water treatment that has shown good result during the last years. The present status of the control system for the PS and SPS cooling stations and the plan for the future modification will be presented. Several other improvements will also be explained: upgrade of the leak detection, the demineralized water production for all CERN cooling plants and PS ventilation system and the chilled water circuit. Since some of these issues will become critical in the short future, a possible consolidation plan will be presented.