Long‐term consolidation of the LHC injector complex
How to keep the proton injector chain (LINAC4, PSB PS & SPS) running for another 25 years
-
Simon Baird12/02/2010, 09:00This talk will introduce the session and outline the boundary conditions that have been set for the following presentations. SPL and PS2 are planned to replace the current LHC pre-injectors (LINAC4, PSB & PS). However, as SPL and PS2 will probably not be on-line and fully operational before early to mid-2020’s, the existing machines will have to run for at least another 12-15 years. This...Go to contribution page
-
Maurizio Vretenar12/02/2010, 09:20This talk will present the measures that have been taken to ensure reliable LINAC4 operation for 25 years. Reference will be made to the experience gained from the operation of LINAC2.Go to contribution page
-
David McFarlane12/02/2010, 09:45This talk will review the potential consolidation measures that would be necessary to ensure continued reliable operation of the PSB for a further 25 years. Where possible approximate time and resource estimates will be given.Go to contribution page
-
Raymond Brown12/02/2010, 10:45This talk will review the potential consolidation measures that would be necessary to ensure continued reliable operation of the PS for a further 25 years. Where possible approximate time and resource estimates will be given.Go to contribution page
-
vinod chohan12/02/2010, 11:15This talk will review the potential consolidation measures that would be necessary to ensure continued reliable operation of the SPS for a further 25 years. Where possible approximate time and resource estimates will be given.Go to contribution page