Follow-up from previous meeting

  • Glue2 support added in v6r19
    • many little issues
    • it should work not only for HTCondor at CERN
  • Looked into adding Glue2 support in ARC CEs, but numbers published are not per-VO

Current situation

DIRAC

  • v6r19p19 is out
    • introduced Glue2 support in BDII2CSAgent (and "corresponing" script)

WebApp:

  • NTR

Pilot:

  • Pilot3 is optional for v6r20 SiteDirectors, using a flag
    • Not tested yet. What's tested is that Pilot2 are still submitted.
    • Currently Pilot3 files are uploaded to the web portal
      • Needs to update the documentation for that

Externals:

  • v6r6p8 created. Used in v6r20, looks OK for now
    • SLC6 and CentOS7 versions created

LCG bundles:

  • v14r1 in testing
    • All looks OK for SLC6
    • CC7 version does not include M2Crypto [to be fixed]
  • current production version is still v13r0
  • DIRACOS: some progress
    • which can be installed using a flag in dirac-install.py script
    • looks OK at first tests, but only for SLC6
    • support for CC7 needed some tweaks, not fully tested yet
    • need to use Jenkins or other CI system
    • suggested to move its repo to Github (necessary if we want it as default from next release)

REST:

  • NTR  

BOINC:

  • NTR, docs still need to be completed

PyGSI:

  • NTR

Documentation

  • Dev documentation to update [Louis]

DB12:

  • NTR, we are using in DIRAC what's in the DIRAC code and not what's in this repo

Release planning, tests and certification

Release planning:

  • v6r19 series
    • NTR
  • v6r20 series
    • pre21 out
    • contains all the new features, so now it's only about testing
    • the flag for enabling bulk submission transaction has been removed
    • Maybe ready next week

Certification process: 

  • v6r20 certification: 
    • Last checks only on 

Weekly development(s) focus

  • NTR

DIRAC: current PRs and tasks being worked on, or topics from Google forum

  • LCD users want to use 255 CHARs for filenames in DFC
    • not a good idea, but they'll do it anyway

DIRAC communities roundtable

  • GridPP:
    • NTR
  • BES: 
    • Started playing with Singularity (made one PR with a fix)
    • Singularity deployment at sites still problematic
      • not sure how to solve it
      • probably some changes in the pilots are needed
  • ILC:
    • see above
  • LHCb: 
    • NTR
  • DIRAC4EGI:
    • NTR
  • Belle2:
    • NTR
  • CNAF:
    • Installed DFC for Virgo
    • Other group 2 VOs interested

AOB

  • DUW agenda updated
    • one of the themes will be for how to handle productions
      • and hopefully coming out with a common plan
      • Luisa created an RFC and would like to discuss it
    • another theme will be data management for the experiments
      • there will also be a presentation from Rucio
        • we just need to prepare for possible integration questions (not suggested and not supported)
    • Ops hackathons being planned
      • One will be a TS hands-on
      • Various users being contacted
  • Next BiLD-Dev meeting will be held in 3 weeks (May 10)

LHCbDIRAC

  • LHCbDIRAC v9r2-pre3 prereleases done
    • installed in LHCb certification
    • managed to run some jobs
  • at most 4 students this summer: proceeding
    • summer student project accepted
    • 2 GSoC projects: hopefully getting students (3 of them submitted a proposal)

 

There are minutes attached to this event. Show them.
    • 10:00 → 10:10
      Items from Previous BiLD-Dev 10m
    • 10:10 → 10:25
      Current situation 15m

      General remarks

      • DIRAC 3m
      • WebApp 2m
      • Pilot 2m
      • Externals 2m
      • lcgBundle 2m
      • Documentation 2m
      • pyGSI, Rest, DB12, BOINC 2m
    • 10:25 → 10:40
      Release planning, tests and certification 15m
    • 10:40 → 11:00
      Weekly development(s) focus 20m
    • 11:00 → 11:10
      DIRAC: current PRs and tasks being worked on 10m

      Ongoing PRs
      - v6r20 PR
      Ongoing tasks
      - ?
      Topics from the google forum
      - ?

    • 11:10 → 11:20
      DIRAC Communities roundtable 10m
    • 11:20 → 11:30
      AOB
      Convener: Federico Stagni (CERN)
    • 11:30 → 11:45
      LHCbDIRAC 15m