Michael BENEDIKT
(CERN, AB-OP)
22/01/2007, 14:00
Requirements on StandBy and intervention services for accelerator operation
Slides
The presentation will review the requirements for Standby and Intervention
services for accelerator operation. The actual support provided by the various
equipment groups and the needs for future operation will be analyzed.
Recommendations on the optimum way of providing the required call-out
services will be given.
Ghislain ROY
22/01/2007, 14:20
General Safety Aspects and PS Access System Issues
Slides
The presentation will highlight the most important changes from 2006 to 2007
on safety aspects for accelerator operation. Any important modifications of
procedures or systems will be outlined (e.g habil. electrique).
The implementation of the PS inflector zone will be analysed and the
requirements on access system and zone layout will be discussed. Last year
during extensive...
Alberto PACE,
Claude Henri SICARD
22/01/2007, 14:45
The Holiday effect, reliance on experts for operations, Standby and intervention services.
Slides
The present trend towards reliance on a single expert
for specific accelerator and infrastructure systems or on
a service supplier which does not have staff adequately
trained due to excessive staff turn-over has evidenced
a number of issues that directly influences the
availability of the accelerators for physics.
The talks will present the issues as seen from the
AB/CO group...
Philippe GAYET,
Stefan LUEDERS
22/01/2007, 16:15
PLC programming - Quality Assurance
Slides
Common-of-the-shelf industrial PLCs have been integrated on a large scale into
many subsystems for accelerators, infrastructure, and detectors as reliable and
robust controllers. The use of these systems does, however, introduce a novel
set of challenges ranging from security issues to code management. Some
events during the run last year indicate that these challenges are not met in a...
Peter SOLLANDER
22/01/2007, 16:45
QA, documentation, tools
Slides
Diagnostics and follow-up of interventions including the
final sign-off and documentation are key elements to
quality assurance both for the requestor and the
service responsible for interventions.
The presentation will give an overview of the workflow
used in the infrastructure domain seen from the CCC,
high-light advantages and weak areas with the current
set-up and will give...
Cristiana Colloca
22/01/2007, 17:15
Infrasctructure consolidation - roofs, tunnels, etc.
Slides
Following a period of low infrastructure consolidation activities, the TS
department has been enabled to increase the resources allocated to this
domain.
A number of issues related to buildings, cooling& ventilation and electricity have
been raised in the past years. One issue in particular has however caused real
problems – equipment buildings having leaking roofs with rain coming...