eulake technical coordination

Europe/Zurich

EULAKE technical coordination meeting 22 May 2018

Room: Enrico Bocchi, Andrey Kirianov, Andrey Zarochentsev, Xavier Espinal

Remote: Antonio Falabella, Andrew Pickford, Wybrand Lohman, Brian Davis

Coordination

  • After the first setup and functional tests need to “open” the usability of the lake and focus on three main activities: 
    • eulake and external "standard" storage (Enrico): xrdcp TPC (Third Party Copy), FTS, gridftp, Data deletion
    • File locality (Andrey Zarochentsev): gathered, scattered and hybrid file co-location methods
    • File layouts: striped and full replica layouts: functionality over the WAN/LAN
    • Network performance (Andrey Kirianov): PerfSonar integration

Thanks to AndreyK, AndreyZ and Enrico for volunteering taking leadership on some of the activities. Need one responsible for “File layout”

  • Reminder: please do document the setup of your disk/nodes in our Twiki: https://twiki.cern.ch/twiki/bin/view/WLCGDatalakes/WebHome

 

Round table:

  • NIKHEF
    • Correct router config still missing. Hopefully solved in about 2 weeks time.
  • CNAF
    • Storage server ready, idea to start with an EOS container deployment.
    • Enrico to write the instructions for deployment in Twiki. 
    • Antonio to document the setup process. 
    • Investigating possibility to offer also a GPFS “volume”
  • RAL
    • RADOS based volume export set on-hold due to time constraints
  • SARA
    • Trying to get x509 certificates and start performing file placement tests from remote.
There are minutes attached to this event. Show them.
    • 14:30 14:35
      Coordination update 5m
    • 14:35 14:55
      Round table 20m
    • 14:55 15:00
      AOB 5m