PASTE meeting

→ Europe/Zurich
2-R-014 (CERN)

2-R-014

CERN

Andrei Tsaregorodtsev
Description
CERN, bat 2 R-014 To join the telephone conference, click here: https://audioconf.cern.ch/call/0165202 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0165202
Production and PASTE Meeting, 9th November 2009, CERN Chair: A.Tsaregorodtsev Minutes: S.Paterson CERN: J.Closier, Z.Mathe, S.Paterson, M.Rashid, R.Santinelli, A.C.Smith, F.Stagni Phone: V.Fernandez, R.Graciani, A.Tsaregorodtsev Apologies: P.Charpentier 0. Ongoing Action List #10918 - Ricardo commented that the installation of certification machine volhcb12 is waiting for the new distribution tools. Machine access procedures are pending Joel's discussions with IT. #10919 - SLC4 machine upgrade scenario is also being prepared by Joel #11223 - Direct submission to CREAM CE can now be tested at some sites (using volhcb06 as a GridFTP server for testing) 1. Production Status Report - Report from the Production meeting L0HLT stripping ran very smoothly with 50 input files per job (~500 jobs). 115 jobs failed since one of the Tier-1s was outside the mask, as raised by Philippe it would be advantageous for these jobs not to be declared 'Failed'. Stuart suggested writing an LHCb specific optimiser that uses the mask to hold jobs in a checking state as a quick solution. The second point is the observed behaviour with the Standard plugin that seems to bias jobs to all Tier-1s except CERN. Andrei commented that the shares can be updated to resolve this issue. - DIRAC services ports Port ranges have been agreed with IT for LHCb VO-boxes in the range 9130 - 9200, a few services are used outside of this range and will be updated. 2. DIRAC Release Update - v4r20p1-3 releases L0HLT stripping with Moore was added. The dirac-service script was updated to discover the handler automatically. 3. DIRAC Tasks - SVN migration o SVN developer environment Adri added a twiki to describe the SVN configuration and setup. Ricardo and Adri mentioned SVN was extremely slow outside of CERN (even with externals removed). Joel will investigate this. o release building and installing scripts The script to build the externals should be ready by today or tomorrow at the latest. Ricardo mentioned that the installation and setup phases will be separated. The distribution building is also progressing. How to build global tags out of local tags and a global distribution. o Subsystems migration status - Framework status Adri migrated the monitoring and logging systems to the Framework system. The old agents framework module will be removed from SVN. - DMS status Andrew will remove all LHCb specific stuff and add an LHCb system DMS. - Production Management status Transformation system (core components) will be factored out of the production management system. The production request service is LHCb specific and will remain in LHCbDIRAC. - LHCbDIRAC status Stuart conveyed that the LHCbSystem and Workflow (previously WorkflowLib) were migrated to the new structure inside LHCbDIRAC. - WMS status Some agents left to be updated. - Bookkeeping status Zoltan commented that the BK system is ready. Some additions to the BK are needed to support CondDB / DDDB tags such that there can be a drop down menu in the request page. Zoltan is preparing a list of the other changes to better formulate productions with a stronger coupling to simulation conditions. This will be presented next week. 4. AOB None
There are minutes attached to this event. Show them.
    • 09:30 → 10:00
      Ongoing actions 30m
      The task list is available via the Savannah DIRAC group ( Task List ). If you are not already registered please do so at the Savannah page. In order to streamline the time spent during PASTE on the actions list only tasks in the status 'ToBeDiscussed' will be discussed there. In case some actions fall by the wayside they will automatically be updated to this status. Therefore the action assignees should take care to update this. For ongoing actions it is advantageous to report any progress in the Savannah tasks each week.
    • 10:00 → 10:30
      Production issues 30m
      - Report from the Production meeting - DIRAC services ports - Jobs failed with "no eligible sites" status
    • 10:50 → 11:10
      DIRAC Release Update 20m
      - v4r20p1-3 releases
    • 11:30 → 12:00
      DIRAC tasks 30m
      - SVN migration o SVN developer environment o release building and installing scripts o Subsystems migration status - Infrastructure monitoring (SAM,SLS,Dashboard) - Framework status - Bookkeeping status - WMS status - DMS status - Production Management status o production job post-execution checks - VO-boxes - Web Portal - Services deployment ( hardware, configuration ) - Documentation
    • 12:20 → 12:30
      AOB 10m