Conveners
LBNF/DUNE Interface meetings: Milestones, MOU common items, EDMS
- Jack Fowler Jr (Duke University (US))
- Elaine Gregory Mc Cluskey (Fermi National Accelerator Lab. (US))
- Jolie Macier (Fermi National Accelerator Lab. (US))
- Eric James (Fermi National Accelerator Lab. (US))
- Marzio Nessi (CERN)
LBNF/DUNE Interface meetings: Installation and Construction Phases for LBNF/DUNE
- There are no conveners in this block
LBNF/DUNE Interface meetings: Review of 30% FSCF final design
- There are no conveners in this block
LBNF/DUNE Interface meetings: LBNF Cryostat design status
- Marzio Nessi (CERN)
- Jack Fowler Jr (Duke University (US))
- Olga Beltramello (CERN)
- Dimitar Mladenov (CERN)
- Filippo Resnati (CERN)
LBNF/DUNE Interface meetings: Finish review of 30% FSCF final design
- There are no conveners in this block
LBNF/DUNE Interface meetings: Review of 30% FSCF final design
- Jack Fowler Jr (Duke University (US))
- Marzio Nessi (CERN)
LBNF/DUNE Interface meetings: Lunch
- There are no conveners in this block
LBNF/DUNE Interface meetings: Planning for next meeting(s)
- There are no conveners in this block
LBNF/DUNE Interface meetings: Lunch
- There are no conveners in this block
LBNF/DUNE Interface meetings: Tour EHN1 and ProtoDUNEs
- There are no conveners in this block
We will present a list of the high level milestones for LBNF/DUNE after the completion of FSCF. The goal will be make sure the logic and sequence is correct and get agreement from all of the stakeholders.
The plans to implement the use of EDMS for LBNF/DUNE document storage, revision control and approvals. This will be for all technical documents, drawings and models.
Doug Pelletier will give a brief overview the current underground campus that will be provided by FSCF at Acceptance for Use and Possession (AUP), (also known as Beneficial Occupancy).
This will describe the 5 different phases of construction for cavern 1 and the CUC. Giving some high level details of overall duration (current times in the schedule), activities that will occur and material flow routes
Subsystems should have a reasonably detailed list of all of the operations that will occur during this activity, a list of tools required, the number of people that will be needed and any special requirements in the space (like lighting, cleanrooms, material handling, survey, electrical power, compressed air, ventilation, etc.). This session should cover the needs for the installation of the...
Subsystems should have a reasonably detailed list of all of the operations that will occur during this activity, a list of tools required, the number of people that will be needed and any special requirements in the space (like lighting, cleanrooms, material handling, electrical power, compressed air, ventilation, etc.). This session should cover the internal piping, proximity cryogenics, CUC...
Subsystems should have a reasonably detailed list of all of the operations that will occur during this activity, a list of tools required, the number of people that will be needed and any special requirements in the space (like lighting, cleanrooms, material handling, survey, electrical power, compressed air, ventilation, etc.). This session should cover the installation needs for both SP and...
Review of current support point design and location of support points.
Review the current 30% design of load points in the slab at 4910 level
Review current design. Railings, bridge cranes underneath, stair connection and interface, work tower interface, addition of paths to cryostats, interface with cleanroom
Need to understand the requirements for egress from 4850 to 4910. This include number of people working at 4910, flow of material (large and small) to 4910, layout of 4910 area during various phases of construction.
This session should review the current requirements for the FSCF final design for the DUNE grounding plans. Josh has identified issues for discussion & resolution.
There is currently a requirement for lifting eyes to be installed in the crown of the excavation over the mezzanines and septum area. Josh has identified issues for discussion and resolution.
Module 0 parts were constructed for several of the critical structural members of the LBNF cryostat. We will review the testing and results of these pieces at Coimbra in Portugal.
The deflections of the cryostat structure is being monitored during filling and was measured during the pressure tests. The results of these measurement will be compared to the calculated results.
Review the footprint of space provided for DUNE in the CUC and how it will be outfitted. This includes a DAQ room and another space intended for office, conf room, break/lunch room, etc. We need to review the following for the DAQ space: is the space adequate, height of the raised floor, routing of electrical and cooling water for the racks, cable trays and fire suppression system. For the...
Review of current requirements and 30 % design. Design input for the bridge crane is needed.